NR NR/L2/SIG/30009/E063 ISSUE 1 PDF

NR NR/L2/SIG/30009/E063 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30009/E063 ISSUE 1 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Approach Locking and Train Operated Route Release

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module covers the application and release of approach locking together with manual and train operated route release for all forms of interlocking systems. These requirements are applicable to new and to altered signalling installations, wherever reasonably practicable and subject to the test of reasonable opportunity.

Purpose

This module forms part of the Signalling Principles Handbook (SPH: NR/L2/SIG/30009).

This module defines the requirements to:

a) maintain the safety of an approaching train after the withdrawal of an authority to proceed at a signal;

b) automatically cancel and release the route after the train has passed the signal.

This module comprises mandatory sections, statements of best practice (to be followed unless an alternative can be demonstrated to be beneficial to the company and no less safe), and guidance. It satisfies the relevant part of the IRSE Fundamental Requirements for Train Control Systems, see Appendix B.


Edition : 1
File Size : 1 file , 450 KB
Number of Pages : 16
Published : 03/03/2018

History

NR NR/L2/SIG/30009/E063 ISSUE 6
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing
$18.6
NR NR/L2/SIG/30009/E063 ISSUE 5
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30009/E063 ISSUE 4
Published Date: 03/04/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing
$18.6
NR NR/L2/SIG/30009/E063 ISSUE 3
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing
$18.6
NR NR/L2/SIG/30009/E063 ISSUE 2
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing
$18.6
NR NR/L2/SIG/30009/E063 ISSUE 1
Published Date: 03/03/2018
Signalling Principles Handbook: Approach Locking and Train Operated Route Release
$13.2

Related products

NR RT/CE/S/009 ISSUE 1
Published Date: 07/01/1996
Track Ballast Returned by Automatic Ballast Cleaners (aka NR/SP/TRK/009)
$13.2
NR TWI 3C008 ISSUE 1
Published Date: 03/01/2005
How to Order Pandrol Clips
$5.7
NR NR/L3/MTC/MG0173 ISSUE 4
Published Date: 09/03/2022
Monitoring of Spoken Safety Communications
$13.2
NR NR/L2/SIG/11201/MOD A5-3/APPENDIX A ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Conventions, General Notes, Dollar Notes and Signaller Route Lists
$18.6

Best-Selling Products

APSP 1-1991
Published Date:
Standard for Public Pools
APSP 5-2003
Published Date: 01/01/2003
Standard for Residential Inground Swimming Pools
APSP 6-1992
Published Date: 08/06/1992
Standard for Residential Portable Spas
APSP 7-2006
Published Date: 01/01/2006
American National Standard for Suction Entrapment Avoidance in Swimming Pools, Wading Pools, Spas, Hot Tubs, and Catch Basins
APSP 9-2005
Published Date: 2005
Standard for Acquatic Recreation Facilities