NR NR/L2/SIG/30009/E450 ISSUE 4 PDF

NR NR/L2/SIG/30009/E450 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30009/E450 ISSUE 4 PDF

Published Date:
03/02/2024

Status:
[ Not for New Design ]

Description:

Signalling Principles Handbook: Module E450 - Overlaps Controls - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module applies to lineside signalling and to railway which is ETCS fitted unless there are no applicable lineside signals.

NOTE: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

This module applies to all command and control equipments (see the typical listing in Module A060 section C1.2) for new provision and, subject to consideration of “using reasonable opportunity” and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/CAT0005) are different to the requirements described in this standard this standard takes precedence. 

Purpose

This module forms part of the Signalling Principles Handbook ( NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook.

Together with modules D450 and E450 which specify overlap requirements in detail, this module sets out Network Rail’s requirements for the provision of overlaps to control the risk, when overrunning a signal at danger, of:

a) collision between a train and another train legitimately present, or

b) derailment, or

c) collision between a train and a level crossing user.

This SPH module comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems, see Appendix E for extract. 


Edition : 4
File Size : 2 files , 880 KB
Number of Pages : 16
Published : 03/02/2024

History

NR NR/L2/SIG/30009/E450 ISSUE 5
Published Date: 09/07/2024
Signalling Principles Handbook: Module E450 - Overlaps Controls
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 4
Published Date: 03/02/2024
Signalling Principles Handbook: Module E450 - Overlaps Controls - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 3
Published Date: 12/02/2023
Signalling Principles Handbook: Module E450 - Overlaps
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 2
Published Date: 09/01/2018
Signalling Principles Handbook: Module E450 - Overlaps
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 1
Published Date: 12/05/2009
Signalling Principles Handbook – Overlap Proving
$7.5

Related products

NR BRS-SM 2251/2
Published Date: 01/20/1987
Rail Clamp Point Lock Bottom Clevis Plate
$5.7
NR T28051 ISSUE 2
Published Date: 06/20/2009
Lineside & on Track Equipment Typical Circuits Signals & Indicators - Banner Repeater Fibre Optic Type; Single; Control & Proving (Locally Indirect Fed)
$5.7
NR SSIDIS162 ISSUE 2
Published Date: 11/05/2009
Swinging Overlap Across a Boundary - Crossover with Separately Numbered Point Ends
$18.6
NR BRS-SM 440/35
Published Date: 12/19/1995
Relocatable Equipment Building General Assembly REB5 Alternative Construction Equipment Rack Framework
$5.7

Best-Selling Products

VG 95370-10
Published Date: 12/01/1983
Electromagnetic Compatibility; Electromagnetic Compatibility of & in Systems - Test Method for Interference Currents
VG 95374-1
Published Date: 11/01/1992
Electromagnetic Compatibility (EMC) including Electromagnetic Pulse (EMP) and Lightning Protection - Program and Procedures - Administrative Regulations