NR NR/L2/SIG/30009/E450 ISSUE 2 PDF

NR NR/L2/SIG/30009/E450 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30009/E450 ISSUE 2 PDF

Published Date:
09/01/2018

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Module E450 - Overlaps

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all changes to signalling where:

a) there are lineside signals; and

b) the changes appreciably alter the overrun risk associated with any of the signals within the scheme. Changes to overrun risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity is generally limited);

d) additional routes are provided;

e) a station is added;

f) permissible or attainable speeds are changed, raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

It is not intended to be applied to minor signalling alterations where the scope of the scheme does not make any material impact to over-run risk on any of the signals within the scheme. For all changes, due cognisance should be taken of the principle of “Using Reasonable Opportunity” to include the provisions of this module

Purpose

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. It details Network Rail’s requirements for the provision of overlaps to control the risk of:

a) collision between a train and another train legitimately present;

b) derailment when overrunning a signal at danger. This module comprises mandatory sections and guidance.

This module comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe.


Edition : 2
File Size : 1 file , 600 KB
Number of Pages : 37
Published : 09/01/2018

History

NR NR/L2/SIG/30009/E450 ISSUE 5
Published Date: 09/07/2024
Signalling Principles Handbook: Module E450 - Overlaps Controls
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 4
Published Date: 03/02/2024
Signalling Principles Handbook: Module E450 - Overlaps Controls - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 3
Published Date: 12/02/2023
Signalling Principles Handbook: Module E450 - Overlaps
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 2
Published Date: 09/01/2018
Signalling Principles Handbook: Module E450 - Overlaps
$18.6
NR NR/L2/SIG/30009/E450 ISSUE 1
Published Date: 12/05/2009
Signalling Principles Handbook – Overlap Proving
$7.5

Related products

NR NR/CIV/SD/2143-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Left Skew 30 Degrees
$5.7
NR SMF/ENV/473 ISSUE 1
Published Date: 06/02/2012
Site Waste Management Plan Proforma
$5.7
NR NR/SP/BUS/02250 ISSUE 1
Published Date: 10/01/2005
Asset Data Management
$13.2
NR BRS-ST 102/1
Published Date:
Frame Column Mounting Schedule Lifting Barrier (Auto) MK II B
$5.7

Best-Selling Products