NR NR/L2/SIG/30009/F060 ISSUE 5 PDF

NR NR/L2/SIG/30009/F060 ISSUE 5 PDF

Name:
NR NR/L2/SIG/30009/F060 ISSUE 5 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module and those directly associated with it equally apply to railway which is ETCS fitted unless there are no applicable lineside signals.

NOTE: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

This module applies to all command and control equipments (see the typical listing in NR/L2/SIG/30009/A060 section C1.2) for new provision and, subject to consideration of “using reasonable opportunity” and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

This module defines the requirements for:

a) the proving that a route has become set and locked (including interlocking states associated with the route setting process are correctly established);

b) the proving that route elements are in their required position;

c) the issuing and withdrawal of the associated movement authority (signal proceed aspect).

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/CAT0005) are different to the requirements described in this standard this standard takes precedence.

Purpose

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. See especially Module A060, and A200 which refers to legacy practices.

The SPH details Network Rail’s requirements for the provision of interlocking between signals, movable infrastructure such as points and other parts of the signalling system to control the risk of:

a) failure of moving infrastructure to establish a wheeled path;

b) collision between a train and another train legitimately present;

c) the issuing of a movement authority to the train driver and its subsequent removal.

The SPH comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems, see Appendix 1 for extract.


Edition : 5
File Size : 1 file , 1.7 MB
Number of Pages : 72
Published : 09/07/2024

History

NR NR/L2/SIG/30009/F060 ISSUE 5
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 4
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 3
Published Date: 03/04/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 2
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 1
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$18.6

Related products

NR NR/L3/SIG/11235/G130/AR1005 ISSUE 1
Published Date: 09/04/2021
Signal Maintenance Testing Handbook: Temporary Strapping of Ground Frame Proving (and Reinstatement)
$5.7
NR NR/L3/TRK/003 ISSUE 43
Published Date: 06/03/2023
Index of Track Engineering Forms
$18.6
NR BRS-SW 67-11 ISSUE 6
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Push Buttons in Two PBI Rings Ring Split at Signal Post
$5.7
NR NR/CIV/SD/111 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Spot Replacement of Bricks
$5.7

Best-Selling Products

BICSI 001-2017 R22
Published Date: 01/01/2017
Information and Communication Technology Systems Design and Implementation Best Practices for Educational Institutions and Facilities
$28.5
BICSI 002-2019
Published Date: 05/01/2019
Data Center Design and Implementation Best Practices
$157.5
BICSI 002-2024
Published Date: 05/01/2024
Data Center Design and Implementation Best Practices
$157.5
BICSI 003-2024
Published Date: 02/29/2024
Building Information Modeling (BIM) Practices for Information Communication Technology Systems
$31.5
BICSI 004-2018
Published Date: 03/01/2018
Information Technology Systems Design and Implementation Best Practices for Healthcare Institutions and Facilities
$64.5
BICSI 006-2020
Published Date: 11/25/2019
Distributed Antenna System (DAS) Design and Implementation Best Practices
$67.5