NR NR/L2/SIG/30009/F060 ISSUE 2 PDF

NR NR/L2/SIG/30009/F060 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30009/F060 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

Additional information:

Updated March 2023 versions of E063 and F060 have been published as preview and can be used prior to formal publication, they include minor corrections that have been raised on December 2022 versions.

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module and those directly associated with it equally apply to railway which is ETCS fitted unless there are no applicable lineside signals. 

NOTE: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

This module applies to all command and control equipments (see the typical listing in NR/L2/SIG/30009/A060 section C1.2) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme. 

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

This module defines the requirements for: 

a) the proving that a route has become set and locked (including interlocking states associated with the route setting process are correctly established); 

b) the proving that route elements are in their required position; 

c) the issuing and withdrawal of the associated movement authority (signal proceed aspect). 

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/CAT0005) are different to the requirements described in this standard this standard takes precedence.

Purpose 

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. See especially Module A060, and A200 which refers to legacy practices. 

The SPH details Network Rail’s requirements for the provision of interlocking between signals, movable infrastructure such as points and other parts of the signalling system to control the risk of: 

 a) failure of moving infrastructure to establish a wheeled path;

 b) collision between a train and another train legitimately present;

 c) the issuing of a movement authority to the train driver and its subsequent removal. 

The SPH comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems, see Appendix 1 for extract. 


Edition : 2
File Size : 1 file , 10 MB
Number of Pages : 71
Published : 12/03/2022

History

NR NR/L2/SIG/30009/F060 ISSUE 5
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 4
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 3
Published Date: 03/04/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 2
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$24.3
NR NR/L2/SIG/30009/F060 ISSUE 1
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Aspect Level
$18.6

Related products

NR NR/L3/SIG/11303/2M10 ISSUE 3
Published Date: 12/03/2016
Signalling Installation: Signals: Signals Not in Use
$7.5
NR RT/ETE/1/3/7
Published Date: 03/17/1998
Brecknell Willis Cable Terminals to Accommodate 500mm. Sq. Cable Connections Asc Conductor Rail
$5.7
NR E10007/25 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Non-Vital Main & Subsidiary Signals Panel Indications
$5.7
NR X07440 ISSUE 1
Published Date: 12/01/2008
AHBC Typical Circuits Double Line Bi-Directional Control Circuits (1) GCP3000 Predictor
$5.7

Best-Selling Products

ABCA ABCA-STD-49A Notice 1 - Cancellation
Published Date: 12/17/2012
Distilling Units Cleaning, Feed Treatment (No S/S Document)
$3.6