NR NR/L2/SIG/30014/A110 ISSUE 2 PDF

NR NR/L2/SIG/30014/A110 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30014/A110 ISSUE 2 PDF

Published Date:
09/04/2010

Status:
[ Revised ]

Description:

Signal Works Testing

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Level 2 standard applies to all Projects to alter Network Rail's infrastructure, or with the potential to affect the fitness for purpose of the Network Rail Infrastructure. It is mandatory for all work with signalling content which requires testing to NR/L2/SIG/30014.

This excludes testing that can be undertaken within the scope of NR/SP/SIG/11231: Signalling Maintenance Testing Handbook (SMTH). GK/RT0209 mandates the correct application of Signalling Maintenance Testing. However SMTH methods may be used as a discrete task in a Project where appropriate. The records of the SMTH works are recorded with the Project testing documentation.

Manufacturer's product testing is the quality assurance testing in the factory of discrete off the shelf products or equipment. This testing would be carried out to standard drawings in accordance with manufacturer's Quality System, and is certified by the issue of Quality Assurance Certificates or Certificates of Conformance. Manufacturer's product testing is outside the scope of signal works testing, and is considered to be part of the supply chain quality management system.

Off site testing comprises any testing of bespoke, uniquely wired equipment, bespoke systems, data or software that is carried out before such equipment, systems, data or software is installed on site in its final configuration. Off site testing is within the scope of signal works testing, and shall be carried out in accordance with the requirements of this standard.

Persons using this document for works involving novel systems are directed to seek counsel from the appropriate Safety Cases where specific and particular test requirements shall have been identified.

It is permissible for simplified design and testing processes to be followed for specific Projects as detailed in NR/L2/SIG/30014/A210. Where there is a conflict between the processes and requirements shown in this standard and NR/L2/SIG/30014/A210, the requirement shown in that standard shall take precedence over this standard. However, where NR/L2/SIG/30014/A210 contains no requirements on a specific subject, then the requirement of this standard shall be followed.

Purpose

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This Level 2 document, in support of GK/RT0209, sets out the mandatory procedures and process controls necessary to confirm that new signalling installations, and alterations to existing installations, are independently tested in a manner that assures:

• Compliance with the Project Concept Design and Engineering Details; and,

• Fitness for purpose before they are offered for entry into service.

It also provides a framework of procedures and process controls that are, as far a practicable, consistent across the Network Rail infrastructure.


Edition : 2
File Size : 1 file , 460 KB
Number of Pages : 30
Published : 09/04/2010

History

NR NR/L2/SIG/30014/A110 ISSUE 7
Published Date: 09/07/2024
Signalling Works Testing Handbook: Use of OTP for Piling
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 6
Published Date: 06/04/2022
Signalling Works Testing Handbook: Signalling Works Testing - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 5
Published Date: 12/07/2019
Signalling Works Testing Handbook: Signalling Works Testing
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 4
Published Date: 09/06/2014
Signalling Works Testing Handbook: Signalling Works Testing
$18.6
NR NR/L2/SIG/30014/A110 ISSUE 3
Published Date: 06/02/2012
Signalling Works Testing
$18.6
NR NR/L2/SIG/30014/A110 ISSUE 2
Published Date: 09/04/2010
Signal Works Testing
$18.6

Related products

NR NR/L3/CTM/306/02 ISSUE 2
Published Date: 12/02/2023
Skills Assessment Scheme: Assessor Competence
$7.5
NR E10000/123/2 ISSUE B
Published Date: 03/20/1980
Time Relays - Use of Thermal Relay to B.R. Spec. 937A
$5.7
NR NR/CIV/SD/4460 ISSUE 2
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Full Structure Sections & Elevations Sheet 1
$5.7
NR NR/L2/ADG/002/03 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Stewardship Management
$7.5

Best-Selling Products

ASHRAE/SMACNA 126-2020
Published Date: 2020
Standard 126-2020 -- Method of Testing HVAC Air Ducts (ANSI/SMACNA Approved)
$22.5