Description:

Signalling Works Testing Handbook: Signalling Works Testing

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This level 2 standard applies to work that meets the selection criteria defined in NR/L2/SIG/30014/A100.

Moving block testing requirements, such as those required for ETCS / ERTMS, are excluded from the scope of the document.

Modular Signalling testing requirements are detailed in NR/L2/SIG/30097, and that standard shall take precedence over this standard with respect to Modular Signalling Projects. However, where NR/L2/SIG/30097 is silent on any aspect of signalling works testing, this standard shall apply instead.

Modular S&C Scheme testing requirements are detailed in NR/L2/SIG/30014/A310, and that standard shall take precedence over this standard with respect to Modular S&C Schemes. However, where NR/L2/SIG/30014/A310 is silent on any aspect of signalling works testing, this standard shall apply instead.

Manufacturer's product testing is the quality assurance testing in the factory of discrete off the shelf products or equipment. This testing would be carried out to standard drawings in accordance with manufacturer's Quality System, and is certified by the issue of Quality Assurance Certificates or Certificates of Conformance. Manufacturer's product testing is outside the scope of signalling works testing, and is considered to be part of the supply chain quality management system.

Off Site Testing comprises any testing of bespoke, uniquely wired equipment, bespoke systems, data or software that is carried out before such equipment, systems, data or software is installed on site in its final configuration. Off site testing is within the scope of signalling works testing, and shall be carried out in accordance with the requirements of this standard.

Persons using this document for works involving novel systems are directed to seek counsel from the appropriate Safety Cases where specific and particular test requirements shall have been identified.

It is permissible for simplified design and testing processes to be followed for specific Projects as detailed in NR/L2/SIG/30014/A210, subject to that project meeting the selection criteria in NR/L2/SIG/30014/A100. Where there is a conflict between the processes and requirements shown in this standard and NR/L2/SIG/30014/A210, the requirement shown in that standard shall take precedence over this standard. However, where NR/L2/SIG/30014/A210 contains no requirements on a specific subject, then the requirement of this standard shall be followed.

Purpose

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This Level 2 document sets out the mandatory procedures and process controls necessary to confirm that new signalling installations, and alterations to existing installations, are independently tested in a manner that assures:

  • Compliance with the Project specifications and Design Details; and,
  • Fitness for purpose before they are offered for Entry into Operational Service. It also provides a framework of procedures and process controls that are, as far as practicable, consistent across the Network Rail infrastructure.

Edition : 4
File Size : 1 file , 380 KB
Number of Pages : 41
Published : 09/06/2014

History

NR NR/L2/SIG/30014/A110 ISSUE 7
Published Date: 09/07/2024
Signalling Works Testing Handbook: Use of OTP for Piling
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 6
Published Date: 06/04/2022
Signalling Works Testing Handbook: Signalling Works Testing - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 5
Published Date: 12/07/2019
Signalling Works Testing Handbook: Signalling Works Testing
$24.3
NR NR/L2/SIG/30014/A110 ISSUE 4
Published Date: 09/06/2014
Signalling Works Testing Handbook: Signalling Works Testing
$18.6
NR NR/L2/SIG/30014/A110 ISSUE 3
Published Date: 06/02/2012
Signalling Works Testing
$18.6
NR NR/L2/SIG/30014/A110 ISSUE 2
Published Date: 09/04/2010
Signal Works Testing
$18.6

Related products

NR NR/CIV/SD/824 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: L-Frame Strengthening New Cross Girder Frame Within A Trough Floor Type 1
$5.7
NR NR/SP/ELP/40042 ISSUE 3
Published Date: 02/01/2006
Periodic Inspection and Testing of Electrical Installations, Appliances and Equipment
$13.2
NR BRS-SM 31
Published Date: 10/21/1958
Saddle - 5 1/2
$5.7
NR TI 015 ISSUE 5
Published Date: 01/01/2009
Signallers' Route Lists
$5.7

Best-Selling Products

ASA C39.1-1955
Published Date: 07/27/1955
ASA American Standard Electrical Indicating Instruments Panel, Switchboard, and Portable Instruments
$17.1
ASA C39.1-1959
Published Date: 06/30/1959
ASA American Standard Requirements for Electrical Indicating Instruments Panel, Switchboard, and Portable Instruments
$17.1
ASA S1.1-1994 (R2004)
Published Date: 03/25/2004
American National Standard Acoustical Terminology
ASA S1.1-2013 (R2024)
Published Date: 10/14/2013
American National Standard for Acoustical Terminology
$50.7
ASA S1.11-1986(R1998)
Published Date: 01/01/1986
American National Standard Specification for Octave-Band and Fractional-Octave-Band Analog and Digital Filters - SAME AS ASA 65
ASA S1.11-2004 (R2009)
Published Date: 06/15/2009
American National Standard Specification for Octave-Band and Fractional-Octave-Band Analog and Digital Filters (Includes Errata 2005)