NR NR/L2/SIG/30014/A210 ISSUE 5 PDF

NR NR/L2/SIG/30014/A210 ISSUE 5 PDF

Name:
NR NR/L2/SIG/30014/A210 ISSUE 5 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signalling Works Testing Processes for Minor Alterations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to work that meets the criteria defined in the application requirements in §4.1.

Purpose 

This module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities. 

This module sets out simplified testing procedures and process controls that, when followed confirm that new signalling installations, and alterations to existing installations, are independently tested in a manner that assures: 

• Compliance with the Project specifications and Design Details; and, 

• Fitness for purpose before they are offered for Entry into Operational Service.


Edition : 5
File Size : 1 file , 250 KB
Number of Pages : 13
Published : 09/07/2024

History

NR NR/L2/SIG/30014/A210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing Processes for Minor Alterations
$13.2
NR NR/L2/SIG/30014/A210 ISSUE 4
Published Date: 09/04/2021
Signalling Works Testing Processes for Minor Alterations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30014/A210 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Design and Testing Processes for Minor or Repetitive Alterations
$7.5

Related products

NR NB 138 ISSUE 1
Published Date: 04/23/2015
Dark Mode Events at MSL LC's
$5.7
NR NR/L3/ELP/27240/NR/DIST C26A ISSUE 2
Published Date: 03/01/2017
Instruction for Measurement and Adjustment of Drop-out Current for Whipp And Bourne Type MM74 HSCB Falling Voltage Unit
$5.7
NR X80012 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Index (3)
$5.7
NR E10161/15 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region WR Control Table Route and Signal (Examples)
$5.7

Best-Selling Products

PLAN PLAN ANALYST BEAM & COLUM
Published Date: 01/01/2000
PLAN ANALYST BEAM & COLUMN CALCULATOR SOFTWARE
PLAN PLAN ANALYST IBC & IRC
Published Date: 01/01/2006
PLAN ANALYST SOFTWARE COMBO FOR THE INTERNATIONAL BUILDING CODE (IBC) AND THE INTERNATIONAL RESIDENTIAL CODE (IRC)
PLAN PLAN ANALYST NFPA 13
Published Date: 01/01/1996
PLAN ANALYST SOFTWARE FOR NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
PLAN PLAN ANALYST SIGN CALC
Published Date: 01/01/2000
PLAN ANALYST SIGN CALCULATOR SOFTWARE