NR NR/L2/SIG/30014/A210 ISSUE 4 PDF

NR NR/L2/SIG/30014/A210 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30014/A210 ISSUE 4 PDF

Published Date:
09/04/2021

Status:
[ Not for New Design ]

Description:

Signalling Works Testing Processes for Minor Alterations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to work that meets the criteria defined in the application requirements in §4.1.

Purpose

This module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling  works testing activities.

This module sets out simplified testing procedures and process controls that, when followed confirm that new signalling installations, and alterations to existing installations, are independently tested in a manner that assures:

•    Compliance with the Project specifications and Design Details; and,

•    Fitness for purpose before they are offered for Entry into Operational Service.


Edition : 4
File Size : 2 files , 490 KB
Number of Pages : 13
Published : 09/04/2021

History

NR NR/L2/SIG/30014/A210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing Processes for Minor Alterations
$13.2
NR NR/L2/SIG/30014/A210 ISSUE 4
Published Date: 09/04/2021
Signalling Works Testing Processes for Minor Alterations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30014/A210 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Design and Testing Processes for Minor or Repetitive Alterations
$7.5

Related products

NR NR/L2/TRK/3415 ISSUE 3
Published Date: 03/04/2023
Refurbishment of Switches and Crossings (aka NR/L3/TRK/3415)
$18.6
NR NR/L2/ELP/27009/MOD C53 ISSUE 1
Published Date: 12/03/2011
Revised Return Conductor Support Design at Booster Transformer Connection Locations
$5.7
NR NR/L2/ELP/27009/MOD C14 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF BEARINGS IN TERMINATION & SUPPORT PULLEYS PRONE TO SEIZURE DUE TO INSUFFICIENT CLEARANCE
$7.5
NR SF/CTM/108E ISSUE 1
Published Date: 09/01/2009
Training Managers Non-Conformance Report (NCR)
$5.7

Best-Selling Products

JOTP JOTP-001
Published Date: 01/08/2013
Allied Ammunition Safety and Suitability for Service Assessment Testing Publication - Guidance
$7.2
JOTP JOTP-010
Published Date: 01/08/2013
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-010A
Published Date: 11/07/2014
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-010B
Published Date: 05/09/2016
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-011
Published Date: 12/05/2014
Safety and Suitability for Service Assessment Testing for Surface and Underwater Launched Munitions
$18
JOTP JOTP-012
Published Date: 07/01/2013
Safety and Suitability for Service Assessment Testing for Aircraft Launched Munitions
$18