NR NR/L2/SIG/30014/B510 ISSUE 4 PDF

NR NR/L2/SIG/30014/B510 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30014/B510 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Not for New Design ]

Description:

Signalling Works Testing: Testing Management including the Appointment of Testers in Charge - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064 NR/GI/T001 for testing to NR/L2/SIG/30014.

The inclusions and exclusions documented in NR/L2/SIG/30014/A110 also apply to the scope of this Module.

Purpose

This Module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities. 

This Module sets the requirements for and responsibilities of the Test and Commissioning Engineer role. 

It details the method of appointment of the Tester in Charge for Projects, and contains requirements regarding the proposal, assessment and appointment of the Tester in Charge along with acceptance of the role by the individual concerned. Appendix B contains detailed guidance on the sufficiency of a Tester in Charge’s Work Experience for a specific Project. 

It defines the requirements and guidance applicable to: 

a) The Testing Management Organisation; 

b) The Lead Tester in Charge and other roles within this organisation; 

c) The agreement in principle to the Testing Management Organisation; 

d) The acceptance of the proposed Testing Management Organisation.

It also covers change in the arrangement applicable to Emergency Work.


Edition : 4
File Size : 2 files , 1.4 MB
Number of Pages : 30
Published : 06/04/2022

History

NR NR/L2/SIG/30014/B510 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Testing Management including the Appointment of Testers in Charge
$18.6
NR NR/L2/SIG/30014/B510 ISSUE 4
Published Date: 06/04/2022
Signalling Works Testing: Testing Management including the Appointment of Testers in Charge - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30014/B510 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Project Specific Appointment of Signalling Testers in Charge
$13.2

Related products

NR E10161/45 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region: WR Control Table: Example of Ground Frame Controls And Releases
$5.7
NR BRS-SM 230 ISSUE C
Published Date: 02/22/1990
Fishplate End with Flange for Insulated Joint
$5.7
NR NR/L3/MTC/RCS0216/GH03 ISSUE 3
Published Date: 06/07/2014
Risk Control Manual: Biological/Chemical Hazards
$5.7
NR NR/L2/ELP/27009/MOD C36 ISSUE 1
Published Date: 12/03/2011
MODIFICATION OF MORRIS LINE ISOLATOR JAW CONNECTION PLATE
$5.7

Best-Selling Products

JSSG JSSG-2000B Notice 1 - Validation
Published Date: 08/21/2009
Air System
$3.6
JSSG JSSG-2000B Notice 2 - Validation
Published Date: 08/06/2014
Air System
$3.6
JSSG JSSG-2001A
Published Date: 10/22/2002
Air Vehicle
$35.7
JSSG JSSG-2001B Notice 1 - Validation 1
Published Date: 01/29/2009
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 2 - Validation 2
Published Date: 12/03/2013
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 3 - Validation 3
Published Date: 09/12/2018
Air Vehicle
$3.6