NR NR/L2/SIG/30014/B510 ISSUE 3 PDF

NR NR/L2/SIG/30014/B510 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30014/B510 ISSUE 3 PDF

Published Date:
09/06/2014

Status:
[ Revised ]

Description:

Signalling Works Testing Handbook: Project Specific Appointment of Signalling Testers in Charge

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Level 2 document applies to all projects to alter Network Rail's infrastructure, or with the potential to affect the fitness for purpose of the Network Rail Infrastructure. It is mandatory for all work with signalling content which requires testing to NR/L2/SIG/30014.

Purpose

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This Level 2 document sets the requirements for providing authority to individuals to appoint Testers in Charge and accept Test and / or Commissioning Plans.

It details the method of appointment of the Tester In Charge for a project, and contains requirements regarding the proposal, assessment and appointment of the Tester In Charge along with acceptance of the role by the individual concerned.

It defines the Tester In Charge roles that may be required on signalling projects.


Edition : 3
File Size : 1 file , 150 KB
Number of Pages : 13
Published : 09/06/2014

History

NR NR/L2/SIG/30014/B510 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Testing Management including the Appointment of Testers in Charge
$18.6
NR NR/L2/SIG/30014/B510 ISSUE 4
Published Date: 06/04/2022
Signalling Works Testing: Testing Management including the Appointment of Testers in Charge - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30014/B510 ISSUE 3
Published Date: 09/06/2014
Signalling Works Testing Handbook: Project Specific Appointment of Signalling Testers in Charge
$13.2

Related products

NR NR/L3/SIG/11761 ISSUE 5
Published Date: 12/02/2017
Handbook for EBI Track 200 Audio Frequency Track Circuit
$13.2
NR NR/L3/SCO/311/20 ISSUE 1
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handover and Handback of Rail Vehicles
$13.2
NR NR/L3/MTC/ME0300/09 ISSUE 1
Published Date: 06/04/2022
Mobile Maintenance Train Operational Procedures: Preparation of MMT, Handover and Hand-Back of Control of the MMT
$7.5
NR E10000/94/37 ISSUE B
Published Date: 03/24/1994
Power Supply - Small UPS System (240/110V) 500 or 1000Va - Active Standby with Auto Switching Cabinet
$5.7

Best-Selling Products

EEMUA /EI Publication 241
Published Date: 06/01/2019
Guidance on the Presence and Operation of Portable Self Energised Electrical/Electronic Devices in Potentially Explosive Atmospheres (Gas and Dust)
$63
EEMUA Publication 133
Published Date: 05/01/2011
Specification for Underground Armoured Cable Protected against Solvent Penetration and Corrosive Attack, Revised 2015
$25.146
EEMUA Publication 138
Published Date: 01/01/2010
Design and Installation of On-Line Analyze Systems, Revised 2015
$83.439
EEMUA Publication 140
Published Date: 11/01/2014
Noise Procedure Specification, Revised 2015
$32.004
EEMUA Publication 141
Published Date: 11/01/2014
Guide to the Use of Noise Procedure Specification, Revised 2015
$30.48
EEMUA Publication 149
Published Date: 01/01/1997
Code of Practice for the Identification and Checking of Materials of Construction in Pressure Systems in Process Plants, Revised 2015
$34.671