NR NR/L2/SIG/30014/C120 ISSUE 5 PDF

NR NR/L2/SIG/30014/C120 ISSUE 5 PDF

Name:
NR NR/L2/SIG/30014/C120 ISSUE 5 PDF

Published Date:
09/07/2024

Status:
[ Not for New Design ]

Description:

Signalling Works Testing: Test Plans - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064 NR/GI/T001 (Testing – General) for testing to NR/L2/SIG/30014. 

 The inclusions and exclusions documented in NR/L2/SIG/30014/A110 also apply to the scope of this Module. 

Purpose

This Module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

The Module specifies requirements for the production of and the information to be contained within Test Plans, and the template to be used when producing Test Plans.

NOTE: Test Plan content requirements contained within other Modules in this handbook are not duplicated here, but are referenced in the Notes in the Test Plan form NR/L2/SIG/30014/C120/TP01. 


File Size : 2 files , 700 KB
Number of Pages : 25
Published : 09/07/2024

History

NR NR/L2/SIG/30014/C120 ISSUE 6
Published Date: 09/07/2024
Signalling Works Testing: Test Plans
$18.6
NR NR/L2/SIG/30014/C120 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Test Plans - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30014/C120 ISSUE 4
Published Date: 12/07/2019
Signalling Works Testing Handbook: Test Plans
$18.6

Related products

NR RT/CE/S/072 ISSUE 1
Published Date: 02/01/2003
'Prevention of Unauthorised Access to the Lineside
$18.6
NR NR/L2/MTC/089 ISSUE 3
Published Date: 12/02/2023
Arrangements for the Exchange of Asset Data and the Continuing Maintenance of Assets Undergoing Change
$24.3
NR RT/E/WI/27128 ISSUE 1
Published Date: 12/04/2004
Operation of Victoria Station 11 KV Supply
$13.2
NR NR/L2/ELP/27023/MOD B ISSUE 2
Published Date: 03/02/2024
Conductor Rail Heating: Design and Installation Requirement for Conductor Rail Heating
$18.6

Best-Selling Products

Survey on Emergency Preparedness Planning
Published Date: 09/01/2000
$9.9