NR NR/L2/SIG/30015 ISSUE 1 PDF

NR NR/L2/SIG/30015 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30015 ISSUE 1 PDF

Published Date:
03/06/2010

Status:
[ Inactive ]

Description:

Specification for Station, Footpath, Bridleway & User Worked Level Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
INACTIVE * PDF ONLY

The specification applies to;

• user-worked crossings,

• footpath crossings,

• bridleways,

• station footpath/barrow crossings.

And also where additional MSL / telephone equipment is provided for each type of crossing. The information contained here is provided as a guide to good practice and is not retrospective.

Purpose

This specification provides the preferred layouts for renewal of crossings as defined in the Scope, and is applicable to new crossings or those assets that are to be renewed during maintenance works. The standard guides the installer/maintainer on how to position equipment when the method of protection has been established, it does not instruct what method of protection to use. The layouts for each type of protection are based on regulation and the latest human factors research.


Edition : 1
File Size : 1 file , 2.5 MB
Number of Pages : 77
Published : 03/06/2010

History


Related products

NR NR/CIV/SD/2500 ISSUE C
Published Date: 12/01/2018
Modular Overbridge Design: General Notes
$5.7
NR NR/L3/CIV/140/218N ISSUE 1B
Published Date: 03/01/1997
Model Clause 218N: Permanent Way Small Plant, Tools & Equipment
$7.5
NR X04750 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Control Circuits (2) Double Line Bi-Directional with Signal Regulation, Stop/Non-Stop Controls and Over-Run Call by Track Circuit with Stopping Train Strike-In
$5.7
NR RT/E/WI/27060 ISSUE 1
Published Date: 12/04/2004
Instruction for Routine Inspection & Secondary Injection Testing of TFH Protection Relays (aka NR/WI/ELP/27060)
$13.2

Best-Selling Products

ASIS ORM.1-2017
Published Date: 06/19/2017
Security and Resilience in Organizations and their Supply Chains - Requirements with Guidance
$57.9