NR NR/L2/SIG/30019 ISSUE 1 PDF

NR NR/L2/SIG/30019 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30019 ISSUE 1 PDF

Published Date:
09/04/2010

Status:
[ Active ]

Description:

Process for Closing or Downgrading Public Level Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This document only applies to level crossings of public status e.g. public road, bridleway or cycleway, or footpath. Where a level crossing with both public and private status exists, this document should apply only to the public element of the level crossing.

Purpose

To define the process for public level crossing closure or downgrade through consideration of all relevant information and formal consultation of interested parties. This will enable the provision of an accurate remit for the renewal, closure or re-classification of public level crossings.


Edition : 1
File Size : 1 file , 330 KB
Number of Pages : 9
Published : 09/04/2010

History


Related products

NR NR/L2/P3M/102 ISSUE 4
Published Date: 12/03/2022
Investment Decision Framework (aka NR/L2/INI/P3M/102)
$13.2
NR NR/L3/OPS/0064 ISSUE 6
Published Date: 06/05/2021
Delivering Work within Possessions (aka NR/L3/INI/CP0064)
$18.6
NR BR 1989 ISSUE 2
Published Date: 12/01/1989
Contract for the Design of Mobile Ground - Train Radios for the Channel Tunnel High Speed Trains
$24.3
NR BRS-SM 323/2
Published Date: 05/01/1980
M3A Point Machine Lockplate for Modified Circuit Controller
$5.7

Best-Selling Products

EPI DCOS (C)
Published Date: 02/01/2016
(CHINESE - TRADITIONAL) Data Centre Operations Standard
$41.1
EPI DCOS (S)
Published Date: 05/01/2016
(SPANISH) Estándar de Operaciones de Centros de Datos
$41.1
EPI DCOS
Published Date: 10/01/2021
Data Centre Operations Standard
$4.2
EPI DCOS
Published Date: 02/01/2016
(ENGLISH) Data Centre Operations Standard
$41.1