NR NR/L2/SIG/30097/APPH1 ISSUE 3 PDF

NR NR/L2/SIG/30097/APPH1 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30097/APPH1 ISSUE 3 PDF

Published Date:
04/07/2014

Status:
[ Active ]

Description:

Modular Signalling: Appendix H1: Implementation and Commissioning Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This guidance applies to all projects deemed to be Modular Signalling Schemes and being implemented on Network Rail infrastructure.

The handbook contains guidance that may only be used in the context of a Modular Signalling Scheme and use in any other context or project type is not supported by this Handbook.

Purpose

Early consideration of implementation and commissioning activities is a key part of developing a scheme. This document contains guidance on these issues for the Modular Signalling system. It is current best practice as identified by Network Rail operators and engineers. Alternative approaches from this guidance may be made but should be justified by specific site conditions and circumstances.

Outline design details illustrating methods of achieving the implementation processes described in this document are contained in Appendix H2.


Edition : 3
File Size : 1 file , 110 KB
Number of Pages : 14
Published : 04/07/2014

History


Related products

NR NR/L2/TEL/30121 ISSUE 2
Published Date: 03/07/2009
Specification for the Maintenance of Recorded Announcement Equipment
$7.5
NR BRS-SM 117/2 ISSUE B
Published Date: 09/28/1974
Guide for Vertical Wheel & Frame 10 Inch
$5.7
NR NR/CIV/SD/1325 ISSUE G
Published Date: 03/01/2019
U-Type Underbridges: Main Girder: Spans up to 20m - Sheet 2 of 2
$5.7
NR BRS-ST 97/12
Published Date:
Plugging Strip for Adjusting Slot in Lamp Arm of Road Flashing Light Signal Auto MK II B
$5.7

Best-Selling Products