NR NR/L2/TEL/30047 ISSUE 5 PDF

NR NR/L2/TEL/30047 ISSUE 5 PDF

Name:
NR NR/L2/TEL/30047 ISSUE 5 PDF

Published Date:
12/05/2009

Status:
[ Inactive ]

Description:

Management of Safety Related Reports for Telecoms Failures

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This specification states the arrangements for the management of safety related reports for telecommunication failures. It specifies the responsibilities to investigate and report, when requested, telecoms equipment failures where they cannot be ruled out as a contributory factor or cause affecting services provided by other disciplines.

The scope for Telecoms includes infrastructure or services provided by Network Rail including reverted Finance Lease equipment and services and where the a failure has been identified as having been caused as a result of failure or mis-operation of a service provided by another discipline.

The management of Safety Related Reports for other disciplines is defined in other Network Rail specifications. For Signalling these are defined in NR/L2/SIG/10047.

Purpose

The purpose of this specification is to define Network Rail's requirement that all safety related failures to telecommunications equipment and services are subject to a unified national system of classification, investigation and review.


Edition : 5
File Size : 1 file , 1.2 MB
Number of Pages : 44
Published : 12/05/2009

History


Related products

NR X03240 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Control Circuits (1) Double Line Bi-Directional with Signal Regulation and Over-Run Call by Treadle and Track Circuit
$5.7
NR NR/L3/CIV/151/F010 ISSUE 17
Published Date: 03/06/2021
Index of Standard Designs and Details for Building and Civil Engineering Works
$18.6
NR NR/SIN/099 ISSUE 5
Published Date: 08/26/2008
Management of Free Wheel Passage for Points
$18.6
NR NR/L3/MTC/RCS0216/GA24 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Installation of Troughing
$5.7

Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
$4.5
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
$4.5
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
Free Download
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
$4.2
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
Free Download
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements
Free Download