Name:
NR NR/L2/TEL/30098 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Revised ]
Publisher:
Network Rail
This Specification is mandatory on Network Rail and its contractors involved in the telecoms testing and commissioning process as defined below.
This Specification shall apply to both newly installed equipment/systems and to modified or upgraded equipment/systems, except for those undertaken as part of the day-to-day maintenance activities.
For non-safety related telecoms equipment/systems the design contractor or installer may undertake the testing and entry into service activities subject to agreement by the Principal Renewal & Enhancement Engineer [Control & Coms] and the Network Rail Project Engineer (NR PE). The NR PE and the Contractors Responsible Engineer/Commissioning Manager (CRE/CM) shall agree the level of testing activity and documentation required for non-safety related telecoms equipment/systems.
This Specification does not cover:
a) the testing of trainborne equipment
b) testing undertaken on day to day maintenance or repair (see NR/SP/TEL/31001 Telecommunications Maintenance Testing and Failure Investigation)
c) contractual Health and Safety Requirements
d) the design of telecoms equipment and systems
e) the installation of telecoms equipment and systems (see NR/CS/TEL/30029 Telecoms Installation)
f) the handback of the new or modified asset to maintenance (see NR/SP/MTC/088 Responsibility for Maintenance of Changed Assets)
| Edition : | 2 |
| File Size : | 1 file , 720 KB |
| Number of Pages : | 36 |
| Published : | 08/26/2008 |