NR NR/L2/TRK/001 ISSUE 15 PDF

NR NR/L2/TRK/001 ISSUE 15 PDF

Name:
NR NR/L2/TRK/001 ISSUE 15 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Inspection and Maintenance of Permanent Way

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:

a) plain line track;

b) switches and crossings (S&C).

The scope of the standard excludes Off track assets and closed lines.

TMEs and SM[T]s are responsible for implementing the requirements of this standard.

Infrastructure Maintenance Engineers (IMEs) are responsible for monitoring compliance with the requirements of this standard.

Purpose

To prescribe the inspections, limits and actions required to prevent track caused derailments, and

To describe the inspections, limits and actions required to optimise track performance, cost and asset life.


Edition : 15
File Size : 1 file , 680 KB
Number of Pages : 19
Published : 03/07/2020

History

NR NR/L2/TRK/001 ISSUE 24
Published Date: 03/02/2024
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 23
Published Date: 06/03/2023
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 22
Published Date: 03/05/2022
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 21
Published Date: 12/04/2021
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 20
Published Date: 09/04/2021
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 19
Published Date: 06/05/2021
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 18
Published Date: 06/05/2021
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 17
Published Date: 03/06/2021
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 16
Published Date: 12/05/2020
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/TRK/001 ISSUE 15
Published Date: 03/07/2020
Inspection and Maintenance of Permanent Way
$13.2

Related products

NR NR/L2/SIG/30099/011 ISSUE 1
Published Date: 06/01/2012
Mechanical Locking: Electrical Locking Equipment Overhaul - 7 Yearly Activity
$5.7
NR NR/L3/ELP/3091 ISSUE 6
Published Date: 09/07/2024
DC Conductor Rail Electrified Lines Working Instructions
$18.6
NR X74760 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS SIGNAL/BARRIER CONTROL & INTERLOCKING CIRCUITS (SINGLE LINE/SINGLE TRACK)
$5.7
NR NR/GN/INI/003 ISSUE 1
Published Date: 09/04/2010
Working on or Adjacent to the Conductor Rail
$7.5

Best-Selling Products

ATP ATP-3.3.7.1
Published Date: 04/22/2014
UAS TACTICAL POCKET GUIDE
$7.2
High Pressure Boilers
Published Date: 06/01/2003
Stationary Engineering
Published Date: 11/01/1995
$24