NR NR/L2/TRK/001/MOD02 ISSUE 7 PDF

NR NR/L2/TRK/001/MOD02 ISSUE 7 PDF

Name:
NR NR/L2/TRK/001/MOD02 ISSUE 7 PDF

Published Date:
09/05/2015

Status:
[ Active ]

Description:

Inspection & Maintenance of Permanent Way: Track Inspection

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
CONTAINS NR/BS/LI/440

This module of NR/L2/TRK/001 covers:

a) frequencies for basic visual track inspections, Section Manager track inspections and Track Maintenance Engineer track inspections;

b) arrangements for planning and undertaking track inspections;

c) cab riding;

d) inspection from vehicles;

e) inspection in poor light conditions and darkness;

f) reporting of inspections completed and defects found;

g) who undertakes the inspections;

h) permitted substitution and delegation of inspections. This module does not cover:

i) the inspection of sidings (see NR/L2/TRK/001/mod17);

j) the visual inspection and the ultrasonic testing of rails (see NR/L2/TRK/001/mod06);

k) the visual inspection and ultrasonic testing of adjustment switches (see NR/L2/TRK/001/mod16);

l) broken rails (see NR/L2/TRK/001/mod08).

m) additional inspection requirements for S&C (see NR/L2/TRK/001/mod05).


Edition : 7
File Size : 1 file , 250 KB
Number of Pages : 25
Published : 09/05/2015

History


Related products

NR NR/CIV/SD/2162-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Left Skew 15º
$5.7
NR NR/L3/OHS/005/01 ISSUE 2
Published Date: 06/04/2022
Design and Construction in a High Street Environment: High Street Project Standards Catalogue - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR RT/CE/S/024 ISSUE 1
Published Date: 03/01/1996
Component Kits for BR MkIII 4- & 6- Hole Glued Insulated Joints (aka NR/SP/TRK/024)
$13.2
NR SAO-CDR-UG-11 ISSUE 2
Published Date: 09/24/2004
IECC CD-ROM Installation Engineer's Note
$13.2

Best-Selling Products

RUREGS SNIP 1.04.03 PART I SEC A 1-6
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть I. (Общие положения. Раздел А (подразделы 1-6))
$8.4
RUREGS SNIP 1.04.03 PART I SEC A 10-13
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть I. (Раздел А (подразделы 10-13))
$7.8
RUREGS SNIP 1.04.03 PART I SEC A 14-24
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть I. (Раздел А (подразделы 14-24))
$7.5
RUREGS SNIP 1.04.03 PART I SEC A 7-10
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть I. (Раздел А (подразделы 7-10))
$8.7
RUREGS SNIP 1.04.03 PART II SEC B 1-5
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть II (Раздел Б (подразделы 1-5))
$6.3
RUREGS SNIP 1.04.03 PART II SEC B 1-9
Published Date: 01/01/1991
СНиП 1.04.03-85* Нормы продолжительности строительства и задела в строительстве предприятий, зданий и сооружений. Часть II (Раздел В (подразделы 1-9), Раздел Г)
$7.5