NR NR/L2/TRK/001/MOD14 ISSUE 7 PDF

NR NR/L2/TRK/001/MOD14 ISSUE 7 PDF

Name:
NR NR/L2/TRK/001/MOD14 ISSUE 7 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module of NR/L2/TRK/001 is applied where the track has been disturbed or a deficiency exists, which affects the Critical Rail Temperature. This might be as result of:

a) deterioration in the track system;

b) maintenance work, heavy maintenance or refurbishment works

c) renewals or enhancements work;

d) 3rd party work originating outside of the railway system;

e) invasive investigations to support a), b) or c);

f) temporary works implemented to support a), b), c) or d);

g) work to, or a deterioration in an adjacent non-track system.

Purpose

This module of NR/L2/TRK/001 covers:

a) prevention of track buckles;

b) maintenance to be undertaken prior to the start of the hot weather period;

c) calculation of Critical Rail Temperatures;

d) mitigation to be taken during hot weather;

e) mitigation to be taken during exceptionally hot weather;

f) limitations on work to be undertaken during hot weather;

g) reporting of track buckles.

NOTE: Detailed guidance for getting track ready for, and managing in, hot weather can be found in the ‘Hot Weather Guidelines for Permanent Way’ blue book (NR/GN/TRK/8000/1).


Edition : 7
File Size : 1 file , 730 KB
Number of Pages : 30
Published : 03/06/2021

History

NR NR/L2/TRK/001/MOD14 ISSUE 8
Published Date: 06/03/2023
Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6
NR NR/L2/TRK/001/MOD14 ISSUE 7
Published Date: 03/06/2021
Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6
NR NR/L2/TRK/001/MOD14 ISSUE 6
Published Date: 12/01/2012
Inspection & Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6

Related products

NR NR/L2/SIGELP/50000/MODA ISSUE 2
Published Date: 09/04/2021
Inspection and Maintenance Periodicities (Including Risk Based Maintenance Criteria) for Signalling Power Distribution Equipment above 175 Volts
$7.5
NR RT/CE/C/019 ISSUE 1
Published Date: 08/01/1995
Agreement for the Construction of New Overbridges by Outside Parties
$18.6
NR BRS-ST 140
Published Date:
Large Location Cupboard Shroud Assembly
$5.7
NR TWI 2P043B ISSUE 4
Published Date: 04/01/2015
How to Change a Concrete Sleeper Using an RRV
$7.5

Best-Selling Products