NR NR/L2/TRK/001/MOD14 ISSUE 8 PDF

NR NR/L2/TRK/001/MOD14 ISSUE 8 PDF

Name:
NR NR/L2/TRK/001/MOD14 ISSUE 8 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module of NR/L2/TRK/001 is applied where the track has been disturbed or a deficiency exists, which affects the CRT. This might be as result of:

a) deterioration in the track system;

b) maintenance work, heavy maintenance or refurbishment works;

c) renewals or enhancements work;

d) third party work originating outside of the railway system;

e) invasive investigations to support a), b) or c);

f) temporary works implemented to support a), b), c) or d); or

g) work to, or a deterioration in an adjacent non-track system.

Purpose 

This module of NR/L2/TRK/001 covers: 

a) prevention of track buckles; 

b) maintenance to be undertaken prior to the start of the hot weather period; 

c) calculation of CRT; 

d) mitigation to be taken during hot weather; 

e) mitigation to be taken during exceptionally hot weather; 

f) limitations on work to be undertaken during hot weather; and 

g) reporting of track buckles. 

NOTE: Detailed guidance for getting track ready for, and managing in, hot weather can be found in the ‘Hot Weather Guidelines for Permanent Way’ blue book (NR/GN/TRK/8000/1). 


Edition : 8
File Size : 4 files , 4.7 MB
Number of Pages : 38
Published : 06/03/2023

History

NR NR/L2/TRK/001/MOD14 ISSUE 8
Published Date: 06/03/2023
Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6
NR NR/L2/TRK/001/MOD14 ISSUE 7
Published Date: 03/06/2021
Inspection and Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6
NR NR/L2/TRK/001/MOD14 ISSUE 6
Published Date: 12/01/2012
Inspection & Maintenance of Permanent Way: Managing Track in Hot Weather
$18.6

Related products

NR SMF/MG/0016 ISSUE 1
Published Date: 04/01/2006
Product Acceptance Submission Form
$5.7
NR BR 10 ISSUE 2
Published Date: 11/01/1973
Painting Schedule Signal Boxes & Signal Department Equipment
$24.3
NR NR/L2/TEL/30022 ISSUE 8
Published Date: 03/05/2022
Engineering Assurance Arrangements for Communications Engineering Schemes and Services
$13.2
NR NR/WI/TEL/30103 ISSUE 1
Published Date: 04/01/2006
Testing Requirements - Public Emergency Telephone System
$7.5

Best-Selling Products