NR NR/L2/TRK/0132 ISSUE 7 PDF

NR NR/L2/TRK/0132 ISSUE 7 PDF

Name:
NR NR/L2/TRK/0132 ISSUE 7 PDF

Published Date:
03/05/2022

Status:
[ Revised ]

Description:

Maintenance Arc Welding of Rails, Switches and Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard covers the repair of plain line, crossings, and switches on Network Rail infrastructure.

Purpose

This standard defines the safe methods for weld repairs to:

a)  control the risk of defective and broken rails; and

b)  restore condition and maximise asset life.


Edition : 7
File Size : 1 file , 1.1 MB
Number of Pages : 34
Published : 03/05/2022

History

NR NR/L2/TRK/0132 ISSUE 8
Published Date: 03/04/2023
Maintenance Arc Welding of Rails, Switches and Crossings
$18.6
NR NR/L2/TRK/0132 ISSUE 7
Published Date: 03/05/2022
Maintenance Arc Welding of Rails, Switches and Crossings
$18.6
NR NR/L2/TRK/0132 ISSUE 6
Published Date: 12/04/2010
Maintenance Arc Welding of Rails, Switches & Crossings
$24.3

Related products

NR NR/L3/TRK/002/F18 ISSUE 2
Published Date: 08/01/2007
Track - PL - Manual Slueing
$5.7
NR X82200 ISSUE 1
Published Date: 06/07/2003
MCB-CCTV Typical Circuits CCTV RX. Cubicle 110V Supply & Earthing Details
$5.7
NR NB 000 ISSUE 48
Published Date: 06/01/2023
Current Index of Notice Boards Contained in NR/L2/SIG/11120
$7.5
NR NR/L2/OHS/501/W2 ISSUE 3
Published Date: 03/04/2023
Trackworker Protection and Warning Systems: Module W2: Automatic Track Warning System (ATWS)
$18.6

Best-Selling Products