NR NR/L2/TRK/0132 ISSUE 8 PDF

NR NR/L2/TRK/0132 ISSUE 8 PDF

Name:
NR NR/L2/TRK/0132 ISSUE 8 PDF

Published Date:
03/04/2023

Status:
[ Active ]

Description:

Maintenance Arc Welding of Rails, Switches and Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard covers the repair of plain line, crossings, and switches on Network Rail infrastructure. 

Purpose

This standard defines the safe methods for weld repairs to:

a) control the risk of defective and broken rails; and

b) restore condition and maximise asset life.


Edition : 8
File Size : 1 file , 1 MB
Number of Pages : 33
Published : 03/04/2023

History

NR NR/L2/TRK/0132 ISSUE 8
Published Date: 03/04/2023
Maintenance Arc Welding of Rails, Switches and Crossings
$18.6
NR NR/L2/TRK/0132 ISSUE 7
Published Date: 03/05/2022
Maintenance Arc Welding of Rails, Switches and Crossings
$18.6
NR NR/L2/TRK/0132 ISSUE 6
Published Date: 12/04/2010
Maintenance Arc Welding of Rails, Switches & Crossings
$24.3

Related products

NR NR/CIV/SD/550 ISSUE E
Published Date: 09/02/2017
Tunnels - Sprayed Concrete Lining Renewal: Overspray in Crown
$5.7
NR E10000/16/11 ISSUE A
Published Date: 02/01/1980
Point Machines - Detector Mechanism Clamp Lock Machines
$5.7
NR NR/L3/CIV/006 ISSUE 12
Published Date: 06/01/2024
Structures, Tunnels and Operational Property Examinations
$18.6
NR SSI8003-66 ISSUE 10
Published Date: 09/03/2022
Restoration of Points
$18.6

Best-Selling Products

SAE/ISO CRP10
Published Date: 01/01/1995
Noise Test Site Variability