NR NR/L2/TRK/038 ISSUE 6 PDF

NR NR/L2/TRK/038 ISSUE 6 PDF

Name:
NR NR/L2/TRK/038 ISSUE 6 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail document specifies the process for recording track geometry at the required frequencies using approved methods. It also specifies the distribution, analysis processes and retention of records made of the track geometry during the recording run.

This document applies to all Maintenance staff, geometry recording staff and geometry processing staff, whose duties include the identification, analysis, planning and rectification of track geometry. It stipulates who has a role in these processes and their accountability.

This document applies to running lines as described in NR/L2/TRK/001/mod11.

Purpose

The purpose of this document is to describe the control process to prevent the risk of derailment caused by track faults of a severity known as ‘Immediate Action Level’ & ‘Intervention Level’ faults. This document specifies process to be taken where substandard track is identified. It is the prequel to actions undertaken by NR/L2/TRK/001/mod11; so that the safety of the line can be maintained until any necessary track repair is completed


Edition : 6
File Size : 1 file , 650 KB
Number of Pages : 16
Published : 06/02/2018

History

NR NR/L2/TRK/038 ISSUE 8
Published Date: 09/04/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2
NR NR/L2/TRK/038 ISSUE 7
Published Date: 06/05/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2
NR NR/L2/TRK/038 ISSUE 6
Published Date: 06/02/2018
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2

Related products

NR T60226 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits TPWS - OSS Function (Complex Approach) Normal Direction (Down). Direction of Travel - Up Acc: Relay Interface Location Case Circuit
$5.7
NR NR/L3/OCS/044/MS-08 ISSUE 6
Published Date: 06/02/2012
Managed Station Manual: Safe Use and Operation of Station Vehicles
$7.5
NR NR/CIV/SD/1925 ISSUE B01
Published Date: 12/01/2018
Underbridge Walkways: Deck & Infill Details
$5.7
NR E10000/2/3 ISSUE A
Published Date: 03/10/1980
Block Circuits Compulsory Train on Line Type
$5.7

Best-Selling Products

AICHE B-2
Published Date: 01/01/1986
DIERS: Technology Summary Emergency Relief Systems for Runaway Chemical Reactions and Storage Vessels: A Summary of Multiphase Flow Methods
$19.5
AICHE B-3
Published Date: 01/01/1986
DIERS: Small/Large Scale Experimental Data and Analysis
$37.5
AICHE B-4
Published Date: 01/01/1986
DIERS: Bench-Scale Apparatus Design and Test Results Large Scale Polystyrene-Ethylbenzene High Viscosity Two-Phase Flow Test Report
$15
AICHE C-19
Published Date: 01/01/2001
CCPS: Making EHS an Integral Part of Process Design
$20.4
AICHE E-24
Published Date: 01/01/1987
TRAY DISTILLATION COLUMNS A Guide to Performance Evaluation
$7.5
AICHE E-29
Published Date: 04/29/1993
PARTICLE SIZE CLASSIFIERS
$19.5