NR NR/L2/TRK/038 ISSUE 8 PDF

NR NR/L2/TRK/038 ISSUE 8 PDF

Name:
NR NR/L2/TRK/038 ISSUE 8 PDF

Published Date:
09/04/2021

Status:
[ Active ]

Description:

Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail document specifies the process for recording track geometry at the required frequencies using approved methods. It also specifies the distribution, analysis processes and retention of records made of the track geometry during the recording run.

This document applies to all Maintenance staff, geometry recording staff and geometry processing staff, whose duties include the identification, analysis, planning and rectification of track geometry. It stipulates who has a role in these processes and their accountability.

This document applies to running lines as described in NR/L2/TRK/001/mod11.

Purpose

The purpose of this document is to describe the control process to prevent the risk of derailment caused by track faults of a severity known as ‘Immediate Action Level’ & ‘Intervention Level’ faults. This document specifies process to be taken where substandard track is identified. It is the prequel to actions undertaken by NR/L2/TRK/001/mod11; so that the safety of the line can be maintained until any necessary track repair is completed.


Edition : 8
File Size : 1 file , 550 KB
Number of Pages : 16
Published : 09/04/2021

History

NR NR/L2/TRK/038 ISSUE 8
Published Date: 09/04/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2
NR NR/L2/TRK/038 ISSUE 7
Published Date: 06/05/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2
NR NR/L2/TRK/038 ISSUE 6
Published Date: 06/02/2018
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2

Related products

NR TWI 3G044 ISSUE 1
Published Date: 03/01/2005
How to Manage a Watchman
$5.7
NR NR/L3/ELP/27406/MOD L ISSUE 1
Published Date: 12/03/2011
Engineering Deliverable Requirements for Electrical Power Asset Design: AC/DC Traction Power Supply Interfaces
$5.7
NR BRS-SE 168
Published Date: 02/03/1979
Position Light Signals Lens Conversion Kit WB&SCO Westlyte Signal E12423
$5.7
NR NR/L3/SCO/313/SP-1.02 ISSUE 3
Published Date: 06/05/2021
On-Track Machines (OTMs) Driver and Operations Standards Manual: Recruitment and Selection of OTM Driver Operators
$7.5

Best-Selling Products

Reinforced Concrete Detailer's Manual
Published Date: 01/01/1971
$8.4