NR NR/L2/TRK/053/MOD04 ISSUE 4 PDF

NR NR/L2/TRK/053/MOD04 ISSUE 4 PDF

Name:
NR NR/L2/TRK/053/MOD04 ISSUE 4 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module of NR/L2/TRK/053 covers:
a) identification of facing switch derailment hazards;
b) arrangements for planning and undertaking detailed inspections of switches;
c) reporting of inspections completed and defects found; and
d) permitted substitution and delegation of inspections.

This module does not cover:
e) frequencies for Basic Visual Inspections, Section Manager [Track] Inspections and Track Maintenance Engineer inspections (see NR/L2/TRK/001/mod02);
f) how to complete a detailed inspection (see NR/L2/TRK/053/mod02); and
g) repair of defects (see NR/L2/TRK/053/mod03).


Edition : 4
File Size : 1 file , 2 MB
Number of Pages : 37
Published : 12/03/2022

History

NR NR/L2/TRK/053/MOD04 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
$18.6
NR NR/L2/TRK/053/MOD04 ISSUE 3
Published Date: 09/07/2019
Inspection and Repair to Control the Risk of Derailment at Switches: Module 4: Technical Information
$13.2

Related products

NR NR/L2/RSE/02009 ISSUE 8
Published Date: 03/04/2023
Engineering Management for Projects
$24.3
NR NR/CIV/SD/F003/610/ADD2 ISSUE B
Published Date: 12/01/2018
Under Track Crossing F003 Addendum
$18.6
NR E10000/83/2 ISSUE G
Published Date: 03/14/1980
A.W.S Inductors - M.A.S Areas
$5.7
NR BRS-SM 594
Published Date: 10/30/1987
Rail Clamp Point Lock Spanner - Pressure Plug for Manifold Block, Vickers Power Pack Type 20
$5.7

Best-Selling Products