Name:
NR NR/L2/TRK/5100 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Inactive ]
Publisher:
Network Rail
This Specification applies to the boundary of Network Rail Controlled Infrastructure and excludes unauthorised access by authorised access points, by level crossings (private and public), from bridges, into lineside structures, launching of projectiles and vehicular incursions.
This Specification is relevant to the following Functions;
• Engineering – Sections 5.1, 5.3, 5.4, 6.2, 8.9
• Government & Corporate Affairs – Sections 5.5, 8.7
• Maintenance – all Sections
• Operations & Customer Service– Section 6.1
• Safety and Compliance – Sections 5.1, 6.3, 8.10
Purpose
To specify the boundary management measures commensurate with assessed risks posed by the adjacent environment and the railway and to incorporate a method of assessing these risks.
| Edition : | 2 |
| File Size : | 1 file , 1.2 MB |
| Number of Pages : | 44 |
| Published : | 08/26/2008 |