NR NR/L2/TRK/6001 ISSUE 2 PDF

NR NR/L2/TRK/6001 ISSUE 2 PDF

Name:
NR NR/L2/TRK/6001 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Revised ]

Description:

Renewals Workbank Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This track procedure applies to all work categories funded by the Track Renewals Capex budget.

The workbank comprises solutions to validated problem statements and is the only recognised source of work items from which the track renewals programme shall be derived.

The majority of volumes and costs relate to rails sleepers and ballast. However the financial provision in the programme incorporates other significant works including:-

  • drainage
  • slab track
  • level crossing surfaces
  • longitudinal timbers
  • fencing

which shall be managed to the same level of detail – location, mileage, extent, type, number etc – as for renewals of rail, sleepers and ballast.

Work items arising from volumetric analysis undertaken by the Senior Business Planning Engineer (Track) shall be used in the later years of the workbank. (eg years 4-10)

Purpose

To define the processes for the management of work items to create annual workbanks which reflect our customers needs, business priorities and the asset policy.

Management of the workbank enables:

• relationships between, and relative ranking of, different items on the same route

• comparison across different routes of similar or different characteristics

• identification of opportunities for

o blockades and possession strategies

o construction techniques and production synergies

o resignalling and remodelling opportunities

• informed route strategies

o with appropriate mixes of maintenance and renewal activity

o gradual asset replacement to deliver changing use and capacity

• consistent application of renewals drivers (e.g. undesirable component types)

• Business Plan production

o creation of future years volumes

o outline budgetary requirements

o draw-off of annual plan volumes

o basis of strategic discussions with Finance, Planning and Regulation and Business Engineering teams

o matching future traffic patterns

o contributory funding for enhancement schemes


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 21
Published : 08/26/2008

History

NR NR/L2/TRK/6001 ISSUE 3
Published Date: 06/04/2022
Management of Track Problem Statements and the Track Refurbishment and Renewal Work Bank
$18.6
NR NR/L2/TRK/6001 ISSUE 2
Published Date: 08/26/2008
Renewals Workbank Management
$18.6

Related products

NR NR/L2/ELP/21085 ISSUE 7
Published Date: 03/02/2024
Earthing and Bonding on A.C. Electrified Railways
$35.4
NR NR/L2/TRK/053 ISSUE 10
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches
$13.2
NR NR/L2/XNG/30020/A27 ISSUE 1
Published Date: 06/04/2022
Level Crossings Design Handbook: Requirements for Gates and Stiles at Level Crossings
$13.2
NR BRS-SM 882/16 ISSUE B
Published Date: 03/20/1989
Fibre Optic Theatre Indicator Screen
$5.7

Best-Selling Products

EA 0004:2001
Published Date: 07/20/2001
Technical specification of supply assembly for high intensity discharge lamps.
EA 0005:2001
Published Date: 07/20/2001
Technical specification of supply assembly for high intensity discharge lamps of double power level.
EA 0006:2002
Published Date: 04/24/2002
Polyvinyl chloride insulated cables to be used in interconnection circuits for household audio equipment.
EA 0007:2002
Published Date: 07/25/2002
Specifications for the checking and aggregation system for recovered paper.
EA 0007:2008
Published Date: 07/30/2008
Specifications for the checking and aggregation system for recovered paper.
EA 0009:2003
Published Date: 01/31/2003
Snub elements of bundle assembled cores for low voltage overhead lines.