NR NR/L2/XNG/300 ISSUE 1 PDF

NR NR/L2/XNG/300 ISSUE 1 PDF

Name:
NR NR/L2/XNG/300 ISSUE 1 PDF

Published Date:
06/03/2017

Status:
[ Active ]

Description:

Supplementary Audible Warning Device (SAWD) Route Business Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard applies to all Routes where SAWDs haves been installed at footpath and bridleway level crossings.

It details the processes for:

a) asset management of SAWDs;

b) planned corrective and preventative maintenance; and

c) reactive maintenance / fault response arrangements.

This standard applies to the National Helpline team, Route Control staff and staff within Maintenance Delivery Units (DUs), namely Signalling & Telecoms Maintenance Engineers and their respective teams.

This standard sets out and defines key roles and responsibilities within Route teams for each of the three activities detailed above

Purpose

The purpose of this standard is to support the wider roll out and installation of Supplementary Audible Warning Devices (SAWDs) by setting out the maintenance arrangements that have been agreed for this product.

This supports management of the risk associated with footpath and bridleway level crossings that are protected by whistle boards.


Edition : 1
File Size : 1 file , 540 KB
Number of Pages : 17
Published : 06/03/2017

History


Related products

NR NR/L2/ELP/27715 ISSUE 4
Published Date: 12/02/2023
Overhead Contact System Design Specification
$18.6
NR NR/L3/ELP/27052/02 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
$13.2
NR RT/ETE/5/3/5
Published Date: 03/17/1998
Typical Arrangement of Negative Bonding for Control Track Isolator, Contactor Panels and Other DC Electrification Line Side Traction Equipment
$5.7
NR SSI8003-73 ISSUE 2
Published Date: 02/01/2002
SSI Data Preparation - Opposing Locking Omitted (aka RT/SSI/8003-73)
$5.7

Best-Selling Products

Design for Earthquakes
Published Date: 01/01/1997
I C B O 9033C92
Published Date: 01/01/1992
CABO/ANSI A117.1 Commentary
ICBO 108H01
Published Date:
Principles of Fire Behavior
ICBO 108H02
Published Date:
Design of Water-Based Fire Protection Systems
ICBO 108H03
Published Date:
Hazardous Materials