Name:
NR NR/L3/CIV/005/3A ISSUE 1 PDF
Published Date:
12/04/2010
Status:
[ Withdrawn ]
Publisher:
Network Rail
This Part of the Manual applies to regular, additional and detailed Inspections.
This Part does not cover:
• the Initial Survey and condition assessment - this is covered in Part 4A;
• examination of the structure of Culverts, the requirements of which are specified in NR/L3/CIV/006/3A: Handbook for the examination of Structures: Part 3A: Culverts.
Guidance on updating records is not within the scope of this Part - it is covered in Part 4B.
Purpose
The purpose of this Part of the Manual is to specify the requirements for inspecting railway Drainage Systems.
| Edition : | 1 |
| File Size : | 1 file , 2.2 MB |
| Number of Pages : | 47 |
| Published : | 12/04/2010 |