Name:
NR NR/L3/CIV/006/3E ISSUE 1 PDF
Published Date:
09/07/2019
Status:
[ Active ]
Publisher:
Network Rail
A Hidden Critical Element Examination will apply to all assets listed in NR/L3/CIV/006/3A. Where a Hidden Critical Examinations is instructed by the RAM (B/C).
Purpose
This module sets out the requirements for Hidden Critical Element Examination applicable to all Operational Property assets to mitigate the risk of functional failure of an Operational Property asset which might result in health, safety, environmental or operational incidents.
The data gathered from the examination will be used to inform decisions on the actions and remedial works that need to be included in a prioritised programme of planned preventative maintenance, repair or renewal (if required) until the next inspection so that there is no unacceptable risk to the safety or performance of the assets.
| Edition : | 1 |
| File Size : | 1 file , 670 KB |
| Number of Pages : | 26 |
| Published : | 09/07/2019 |