NR NR/L3/CIV/199 ISSUE 1 PDF

NR NR/L3/CIV/199 ISSUE 1 PDF

Name:
NR NR/L3/CIV/199 ISSUE 1 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Escalator and Moving Walk Construct, Commission and Decommission

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

The work instruction defines the process of construction, commissioning and decommissioning of new installations and refurbishment of EMWs within the operational property portfolio and third-party schemes on Network Rail infrastructure.

NOTE 1: See NR/L2/OHS/0047 ‘Managing Health and Safety in Construction (application of the Construction (Design and Management) Regulations to Network Rail’ for the requirements for managing the implementation of Construction (Design and Management) Regulations.

NOTE 2: See NR/L2/CIV/003 ‘Engineering and Architectural Assurance of Buildings and Civil Engineering Works’ for the management of a Lift Project assurance.

NOTE 3: See NR/L2/RSE/02009 ‘Engineering Management for Projects’ for the Network Rail engineering management of Lift Projects.

NOTE 4: See NR/L2/INI/P3M/102 ‘Investment Decision Framework and Programme Delivery Lifecycle’ for the investment Programme Delivery Lifecycle.

NOTE 5: See NR/L2/P3M/201 ‘Project Acceleration in a Controlled Environment (PACE)’ for the management and control Lift Projects.

Purpose

The purpose of this work instruction is to provide a systematic approach to the construction, commissioning and decommissioning of escalators and moving walk (EMW) assets.


Edition : 1
File Size : 1 file , 1.5 MB
Number of Pages : 95
Published : 03/05/2022

History


Related products

NR NR/L3/ELP/SAI25/12 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): Management of Local Earthed Isolation Instructions for Overhead Line Equipment
$13.2
NR RT/E/S/40050 ISSUE 1
Published Date: 04/04/1999
Maintenance of Air Conditioning & Ventilation Equipment
$13.2
NR NR/CIV/SD/4506
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Design Council Review Response
$5.7
NR T25140 ISSUE 2
Published Date: 09/11/1997
Lineside & on Track Equipment Typical Circuits Points Detection Summation Circuits (1). Hydraulic Operation
$5.7

Best-Selling Products