NR NR/L3/ELP/SAI25/12 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/12 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/12 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Working On or About Overhead Line Equipment (SAI): Management of Local Earthed Isolation Instructions for Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-sai25-12-issue-1_2762835

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module states the requirements for the management of local earthed isolation instructions for the isolation and earthing of Overhead Line Equipment where local earthed isolation is allowed, in accordance with Module 8, on Overhead Line Equipment.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

It is also applicable to Train Operating Companies having locally controlled Overhead Line Equipment which abut those controlled by Network Rail.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard on all infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z). 

Purpose

This module provides a consistent approach to the production, approval, distribution and auditing of local earthed isolation instructions on Overhead Line Equipment.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16). 


Edition : 1
File Size : 1 file , 280 KB
Number of Pages : 19
Published : 06/03/2023

History


Related products

NR NR/CIV/SD/F003/700/ADD2 ISSUE B
Published Date: 06/01/2019
Non-Canopy Station Footbridges: Form 003 Addendum: SDC Review Package A
18.60 €
NR NR/L2/TRK/4239 ISSUE 3
Published Date: 12/02/2023
Track Bed Investigation, Design and Installation
24.30 €
NR NR/L3/OCS/043/1.9 ISSUE 1
Published Date: 03/01/2008
National Control Instructions Section 1.9 Guidance: Contingency Planning
13.20 €
NR E10083/15 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region A.W.S. Inductors Inductor Associated with Signal Reading from Through Unfitted Route to Fitted Route
5.70 €

Best-Selling Products

DIN 10 - DRAFT
Published Date: 12/01/2008
Draft Document - Squares of parallel shanks for rotating tools
11.12 €
DIN 10050-3
Published Date: 09/01/1999
Testing of butter wrappers - Part 3: Colony count
15.70 €
DIN 10050-4
Published Date: 12/01/1973
Testing of butter wrappers; determination of resistance against delamination
7.85 €
DIN 10050-5
Published Date: 09/01/1999
Testing of butter wrappers - Part 5: Determination of fat stability of the surface contacting the butter during continuous charge
13.41 €
DIN 10050-7
Published Date: 12/01/1973
Testing of butter wrappers, determination of water soluble components of the surface of the wrapper contacting butter
7.85 €
DIN 10050-8
Published Date: 09/01/1999
Testing of butter wrappers - Part 8: Determination of water insoluble sodium chloride free ash
13.41 €