NR NR/L3/CTM/306 ISSUE 1 PDF

NR NR/L3/CTM/306 ISSUE 1 PDF

Name:
NR NR/L3/CTM/306 ISSUE 1 PDF

Published Date:
09/04/2010

Status:
[ Revised ]

Description:

Competence Assurance: Assessment in the Line (AiTL)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This procedure applies to all Network Rail employees who have responsibilities for managing, maintaining and administering of competence.

This document defines the three key processes that are used when completing:

• initial competence assessment;

• competence review;

• verification.

This document also defines the processes that are used to:

• approve assessors;

• facilitate knowledge tests;

• issue Authority to Work and/or Sentinel Card certification.

These processes apply to any competences contained within the Network Rail competence standards and defined in Oracle as "in scope" of Assessment in The Line.

Purpose.

This procedure sets out the responsibilities, scope, methods and processes to be followed in order to confirm that the competence of an employee of Network Rail matches the requirements of their post and to establish any training, support or development they require to maintain their competence.


Edition : 1
File Size : 1 file , 490 KB
Number of Pages : 44
Published : 09/04/2010

History

NR NR/L3/CTM/306 ISSUE 4
Published Date: 09/07/2024
Skills Assessment Scheme
$13.2
NR NR/L3/CTM/306 ISSUE 3
Published Date: 12/02/2023
Skills Assessment Scheme - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L3/CTM/306 ISSUE 2
Published Date: 12/05/2015
Skills Assessment Scheme
$13.2
NR NR/L3/CTM/306 ISSUE 1
Published Date: 09/04/2010
Competence Assurance: Assessment in the Line (AiTL)
$18.6

Related products

NR NR/L3/SCO/311/08 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
$13.2
NR X20019 ISSUE 1
Published Date: 02/05/2000
ABCL Typical Circuits Methods to Overcome Potential Timing Problems (2)
$5.7
NR NR/CIV/SD/1083 ISSUE B
Published Date: 03/05/2011
Box Girder Underbridge Single Track 2 Girders & Double Track 3 Girders > 30 - 55 Degrees Skew Details Sheet 1 of 2
$5.7
NR TPWS/TI/035 ISSUE 1
Published Date: 03/01/2003
Positioning of OSS+ for TPWS+
$5.7

Best-Selling Products

AICHE B-2
Published Date: 01/01/1986
DIERS: Technology Summary Emergency Relief Systems for Runaway Chemical Reactions and Storage Vessels: A Summary of Multiphase Flow Methods
$19.5
AICHE B-3
Published Date: 01/01/1986
DIERS: Small/Large Scale Experimental Data and Analysis
$37.5
AICHE B-4
Published Date: 01/01/1986
DIERS: Bench-Scale Apparatus Design and Test Results Large Scale Polystyrene-Ethylbenzene High Viscosity Two-Phase Flow Test Report
$15
AICHE C-19
Published Date: 01/01/2001
CCPS: Making EHS an Integral Part of Process Design
$20.4
AICHE E-24
Published Date: 01/01/1987
TRAY DISTILLATION COLUMNS A Guide to Performance Evaluation
$7.5
AICHE E-29
Published Date: 04/29/1993
PARTICLE SIZE CLASSIFIERS
$19.5