NR NR/L3/SCO/311/08 ISSUE 3 PDF

NR NR/L3/SCO/311/08 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/08 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sco-311-08-issue-3_2762768

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module. 

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details the procedure by which SCO vehicles are removed from and released to traffic in accordance with the maintenance plan or when defects are identified.

The application of the requirements and procedures contained within this module mitigate the following high-level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure. 


Edition : 3
File Size : 1 file , 260 KB
Number of Pages : 11
Published : 03/05/2022

History

NR NR/L3/SCO/311/08 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
13.20 €
NR NR/L3/SCO/311/08 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
7.50 €
NR NR/L3/SCO/311/08 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
7.50 €

Related products

NR TWI 3G025 ISSUE 1
Published Date: 03/01/2005
How to Manage Exceptionally Hot Weather
5.70 €
NR RT/LS/C/003 ISSUE 1
Published Date: 10/01/1999
Health & Safety, Quality & Environment Plan(S) and Assurance Cases Explained
13.20 €
NR BRS-SE 5192
Published Date: 11/20/1986
Flashing Warning Road Lights Parts List for Assembly with 'Standing Man' Sign
5.70 €
NR NR/L3/OCS/044/MS-16 ISSUE 3
Published Date: 06/04/2011
Managed Station Manual: for Cause Testing
7.50 €

Best-Selling Products

HOLDEN ETPSL0026
Published Date: 11/01/2012
H Point Measurement
23.40 €
HOLDEN ETPSL0039
Published Date: 05/01/2012
ADR 21/00 Instrument Panel Impact Test Procedure
23.40 €
HOLDEN ETPSL0044
Published Date: 11/01/2012
Demisting of Vehicle Windscreen for Categories MA MC ADR 15
23.40 €
HOLDEN ETPSL0101
Published Date: 05/01/2012
Closure Stiffness Testing
23.40 €
HOLDEN ETPSLR0008
Published Date: 11/01/2012
Door Weatherstrip Slam Test
23.40 €
HOLDEN ETPSLR0061
Published Date: 11/01/2012
Steering Gear Impact Test
23.40 €