NR NR/L3/ELP/27052 ISSUE 7 PDF

NR NR/L3/ELP/27052 ISSUE 7 PDF

Name:
NR NR/L3/ELP/27052 ISSUE 7 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working Instructions for D.C. Electrified Lines on the Northern City Line

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

These instructions apply to all staff, including contractors, undertaking the operation and maintenance of the Northern City Line from the buffer stops at Moorgate to the north end of platform ramps at Drayton Park Station at 2m 64ch.

Trains can run into Drayton Park whilst the Northern City Line is shut down.

Purpose 

The purpose of this standard is to set out: 

a. the electrical safety requirements for persons working on or near to 3rd rail DC electrified lines on the Northern City Line that will enable them carry out their duties without risk of danger from the conductor rail to themselves or other persons and 

b. the railway operating and safety requirements that apply specifically to the Northern City Line and 

c. the requirements for working of trains on the Northern City Line.


Edition : 7
File Size : 1 file , 600 KB
Number of Pages : 15
Published : 06/04/2022

History

NR NR/L3/ELP/27052 ISSUE 8
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 7
Published Date: 06/04/2022
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 6
Published Date: 06/05/2021
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 5
Published Date: 03/07/2020
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2

Related products

NR NR/L3/SIG/10064/GI/P015 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Safety Signs for S&T Installations
$5.7
NR NR/L3/MTC/RCS0216/GHE07 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Work that May Kill/Damage animals/Plants/ Protected Sites ( Work on structures, tunnels, buildings, lineside and Vegetation)
$5.7
NR BRS-SM 890/1/4 ISSUE D
Published Date: 04/20/1989
Rail Clamp Point Lock - Body Support Bracket for Fabricated Body Assembly (Plain Leads & SDs on Timber)
$5.7
NR NR/CIV/SD/FORMA/272 ISSUE 1
Published Date: 06/04/2016
Form A: Scaling
$13.2

Best-Selling Products

AIA AIA NAS SET
Published Date: 04/01/2023
COMPLETE HARDCOPY SET OF AEROSPACE INDUSTRIES ASSOCIATION (AIA) NATIONAL AEROSPACE STANDARDS - INCLUDES ALL CURRENT & INACTIVE FORNEW DESIGN NAS, NASM, NA & METRIC NAS STANDARDS* * 12 VOLUME SET ADD ON 12" GLOBAL BINDER 3" WHITE & (1) GLOBAL BINDER 1" WHITE
AIA ARTC-4
Published Date: 07/01/1960
[BEST AVAILABLE COPY] Electrical Test Procedures for Radomes and Radome Materials
$20.7
AIA NA0001-0006
Published Date: 03/31/2011
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
$19.8
AIA NA0001-0006
Published Date: 01/01/1978
Rivet, Solid - Universal Head Aluminum and Aluminum Alloy, Metric
$19.8
AIA NA0001-0006
Published Date: 12/19/2014
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
$16.5
AIA NA0001-0006
Published Date: 12/19/2014
RIVET, SOLID, UNIVERSAL HEAD, ALUMINUM AND ALUMINUM ALLOY, METRIC
$19.8