NR NR/L3/ELP/27052 ISSUE 6 PDF

NR NR/L3/ELP/27052 ISSUE 6 PDF

Name:
NR NR/L3/ELP/27052 ISSUE 6 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Working Instructions for D.C. Electrified Lines on the Northern City Line

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

These instructions apply to all staff, including contractors, undertaking the operation and maintenance of the Northern City Line from the buffer stops at Moorgate to the north end of platform ramps at Drayton Park Station at 2m 64ch.

Trains can run into Drayton Park whilst the Northern City Line is shut down.

Purpose

The purpose of this standard is to set out:

a. the electrical safety requirements for persons working on or near to 3rd rail DC electrified lines on the Northern City Line that will enable them carry out their duties without risk of danger from the conductor rail to themselves or other persons and

b. the railway operating and safety requirements that apply specifically to the Northern City Line and

c. the requirements for working of trains on the Northern City Line.


Edition : 6
File Size : 1 file , 760 KB
Number of Pages : 15
Published : 06/05/2021

History

NR NR/L3/ELP/27052 ISSUE 8
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 7
Published Date: 06/04/2022
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 6
Published Date: 06/05/2021
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/ELP/27052 ISSUE 5
Published Date: 03/07/2020
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2

Related products

NR NR/L2/CIV/191/05 ISSUE 3
Published Date: 03/02/2024
Mining Manual: Managing the Risk from Mining in Design and Construction
$18.6
NR RT/E/C/19011 ISSUE 1
Published Date: 06/01/1996
SIGNALLING EQUIPMENT TECHNICAL ADVICE NOTICE (SIGTAN011) SILVER TO SILVER CONTACTS - DC POLARISED MOVING IRON RELAYS
$7.5
NR RT/LS/P/032 ISSUE 3
Published Date: 06/01/2005
Line Managers Self-Assurance (aka NR/SP/ASR/032)
$13.2
NR RT/E/WI/00016 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Remote Control Systems
$18.6

Best-Selling Products