NR NR/L3/ELP/27232 ISSUE 2 PDF

NR NR/L3/ELP/27232 ISSUE 2 PDF

Name:
NR NR/L3/ELP/27232 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Work Instruction for Defect Reporting

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This Work Instruction is specific to the South East area.

Purpose

This instruction details the procedure to be adopted for written reporting of defects found on:

a) Substation plant, remote control and protection equipment using the standard defect report form TPS/P/155/1; and,

b) HV and pilot/supervisory cables and associated equipment using a standard tick box report form TPS/P/154/1.

Reports shall be used to analyse equipment behaviour trends and to help determine future maintenance and equipment renewal policy.


Edition : 2
File Size : 1 file , 500 KB
Number of Pages : 7
Published : 08/26/2008

History

NR NR/L3/ELP/27232 ISSUE 2
Published Date: 08/26/2008
Work Instruction for Defect Reporting
$7.5
NR NR/WI/ELP/27232 ISSUE 1
Published Date: 12/01/2005
Work Instruction for Defect Reporting (aka NR/GN/ELP/27232)
$7.5

Related products

NR NR/L2/SIG/30009/D310 ISSUE 4
Published Date: 12/04/2021
Signalling Principles Handbook: Control of Signals
$18.6
NR RT/LS/CAT004 ISSUE 4
Published Date: 02/01/2000
Index of Railtrack Documents Relating to Signing and Communications Equipment Part 2 - Signalling Structure Drawings (aka NR/CAT/SIG/004)
$7.5
NR BRS-SM 2500
Published Date: 01/30/1995
Type 63 Point Machine Detection Gauges 1mm and 2mm Thickness
$5.7
NR NR/L2/SIG/11201/MODA06 ISSUE 5
Published Date: 09/03/2011
Signalling Design Handbook: Safety Hazards Requiring Retrospective Work
$7.5

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990