Name:
NR NR/L3/ELP/27232 ISSUE 2 PDF
Published Date:
08/26/2008
Status:
[ Active ]
Publisher:
Network Rail
This Work Instruction is specific to the South East area.
Purpose
This instruction details the procedure to be adopted for written reporting of defects found on:
a) Substation plant, remote control and protection equipment using the standard defect report form TPS/P/155/1; and,
b) HV and pilot/supervisory cables and associated equipment using a standard tick box report form TPS/P/154/1.
Reports shall be used to analyse equipment behaviour trends and to help determine future maintenance and equipment renewal policy.
| Edition : | 2 |
| File Size : | 1 file , 500 KB |
| Number of Pages : | 7 |
| Published : | 08/26/2008 |