Name:
NR NR/WI/ELP/27232 ISSUE 1 PDF
Published Date:
12/01/2005
Status:
[ Revised ]
Publisher:
Network Rail
Purpose
This instruction details the procedure to be adopted for written reporting of defects found on:
(a) Substation plant, remote control and protection equipment using the standard defect report from TPS/P/155/1; and,
(b) HV and pilot/supervisory cables and associated equipment using a standard tick box report form TPS/P/154/1.
Reports shall be used to analyse equipment behaviour trends and to help determine future maintenance and equipment renewal policy.
| Edition : | 1 |
| File Size : | 1 file , 130 KB |
| Number of Pages : | 8 |
| Published : | 12/01/2005 |