NR NR/L3/ELP/27240/NR/DIST C10E ISSUE 3 PDF

NR NR/L3/ELP/27240/NR/DIST C10E ISSUE 3 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C10E ISSUE 3 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Routine Inspection and Secondary Injection Testing of SA2 thermal Relay (K11 25 kV Only)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C10E

Includes: SA2 thermal relay fitted to K11 25kV circuit breakers

Excludes: All other SA2 thermal relays


Edition : 3
File Size : 1 file , 69 KB
Number of Pages : 3
Published : 03/01/2017

History


Related products

NR TEF 3262 ISSUE 3
Published Date: 12/01/2019
S&C Design - Risk Categorisation Tool
$5.7
NR NB 039 ISSUE 5
Published Date: 03/01/2007
TFMs and Change of Component Labels
$5.7
NR T34095 ISSUE 1
Published Date: 12/07/2002
Lineside & on Track Equipment Typical Circuits TPWS - Self Powered SSI Trackside Enclosure
$5.7
NR TWI 3G122 ISSUE 1
Published Date: 03/01/2005
How to Plan a Road Closure
$5.7

Best-Selling Products

UNE-CEN/TR 12401:2009 IN
Published Date: 10/28/2009
Dentistry - Guidance on the classification of dental devices and accessories
UNE-CEN/TR 12566-5:2010 IN
Published Date: 01/20/2010
Small wastewater treatment systems up to 50 PT - Part 5: Pre-treated Effluent Filtration systems
UNE-CEN/TR 13445-9:2009 IN
Published Date: 10/28/2009
Unfired pressure vessels - Part 9: Conformance of the EN 13445 series to ISO 16528
UNE-CEN/TR 13480-7:2003
Published Date: 01/17/2003
Metallic industrial piping . Part 7: Guidance on the use of conformity assessment procedures.
UNE-CEN/TR 13548:2007 IN
Published Date: 09/26/2007
General rules for the design and installation of ceramic tiling
UNE-CEN/TR 13688:2008 IN
Published Date: 12/22/2008
Packaging - Material recycling - Report on requirements for substances and materials to prevent a sustained impediment to recycling