NR NR/L3/ELP/27240/NR/DIST C16C ISSUE 4 PDF

NR NR/L3/ELP/27240/NR/DIST C16C ISSUE 4 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16C ISSUE 4 PDF

Published Date:
03/02/2019

Status:
[ Active ]

Description:

Isolation and Earthing of 25 kV Switching Stations Incorporating Vacuum Circuit Breakers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
NR/L3/ELP/27240/NR/DIST C16C

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of High Voltage Permits to Work or Sanction for Test, to enable work/testing to be carried out on this equipment or the connections thereto.

The following instructions apply to all 25kV switching stations incorporating vacuum C.B.s but excludes the following sites:

Excludes:

Switching Station Relevant Instruction

Hackney Downs No. 2 NR/DIST C16h

Incline T.S.C. NR/DIST C16i

York Way T.S.C. NR/DIST C16j

Drayton Park A & B NR/DIST C16n

All Feeder Stations with Harmonic Filters


Edition : 4
File Size : 1 file , 140 KB
Number of Pages : 17
Published : 03/02/2019

History


Related products

NR NR/L3/SIG/10064/GI/B001 ISSUE 4
Published Date: 06/04/2022
General Instructions to Staff Working on S&T Equipment: Work that Could Affect the Operation of Signalling Equipment, but Can Be Carried Out between Trains
$5.7
NR NR/L3/MTC/RCS0216/DP30 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working on Gas Systems
$5.7
NR NR/L2/OPS/035 ISSUE 4
Published Date: 08/26/2008
Dissemination of Urgent Operating Advice (aka NR/SP/OPS/035)
$7.5
NR BRS-SE 168/1
Published Date:
Position Light Signal Lens Conversion Kit Lens Ring WB&SCO 'WESTLYTE' Signal E12423
$5.7

Best-Selling Products