NR NR/L3/ELP/27240/NR/DIST C19B ISSUE 2 PDF

NR NR/L3/ELP/27240/NR/DIST C19B ISSUE 2 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C19B ISSUE 2 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Condition Assessment for HV & DC Distribution Assets

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
NR/L3/ELP/27240/NR/DIST C19B

This instruction applies to locations supplying the DC traction system; DC Substations (SS), Track Paralleling Huts (TPH) and Switching Locations (Sw).

Purpose

This document specifies the procedure to be followed so that HV & DC distribution assets undergo condition assessments in a correct and consistent manner in accordance with methodology specified. This activity is a requirement from the Office of Rail Regulation for the collection of asset condition data.


Edition : 2
File Size : 1 file , 190 KB
Number of Pages : 15
Published : 03/01/2017

History


Related products

NR T60121 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Standard Route Indicator (F. O. 2 Indications) Acc: Relay Interface Location Case Circuit
$5.7
NR BRS-SM 370
Published Date: 04/01/1970
FPL Bar Fitting (BH Rail) Rail Clip Complete - Type 'A'
$5.7
NR NR/CIV/SD/2166-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Right Skew 30º
$5.7
NR RT/D/P/063 ISSUE 1
Published Date: 11/01/1996
MANAGEMENT OF TRACK RENEWALS CONTRACTOR'S STEWARDSHIP AND PROGRESS REPORTS
$13.2

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990