NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 6 PDF

NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 6 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 6 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-27240-nr-dist-c20a-issue-6_2761747

Choose Document Language:
7.50 €
Need Help?
NR/L3/ELP/27240/NR/DIST C20A

Includes: This instruction covers the routine inspection and maintenance tasks to be carried out on Substations and associated buildings (TP huts, switching stations, and distribution points) on DC Electrified lines.


Edition : 6
File Size : 1 file , 410 KB
Number of Pages : 9
Published : 06/03/2023

History

NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 6
Published Date: 06/03/2023
Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines
7.50 €
NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 5
Published Date: 03/08/2021
Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines
7.50 €
NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 4
Published Date: 12/05/2020
Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines
7.50 €
NR NR/L3/ELP/27240/NR/DIST C20A ISSUE 3
Published Date: 06/01/2017
Routine Inspection and Maintenance of Substations and Associated Buildings on DC Electrified Lines
5.70 €

Related products

NR T25315 ISSUE 1
Published Date: 03/06/2010
Lineside & On Track Typical Circuits Points Point Machine - SSI. SSI Module Output & Input Circuits
5.70 €
NR NR/L3/SIG/30051 ISSUE 1
Published Date: 03/06/2010
Signalling Functional Power Loads Data Management
13.20 €
NR NR/L3/OPS/045/3.10 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment
5.70 €
NR NR/L3/OPS/045/3.29 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.29: Ground Frame Local Instructions
5.70 €

Best-Selling Products

AS/NZS 10002:2014
Published Date: 10/29/2014
Guidelines for complaint management in organizations
31.68 €
AS/NZS 1015:2011
Published Date: 10/07/2011
Records management - Physical storage
21.58 €
AS/NZS 1020:1995
Published Date: 03/05/1995
The control of undesirable static electricity
36.63 €
AS/NZS 1020:2023
Published Date: 06/02/2023
The control of static electricity in non-hazardous areas
23.17 €
AS/NZS 1026:2004
Published Date: 04/29/2004
Electric cables - Impregnated paper insulated - For working voltages up to and including 19/33 (36) kV
30.49 €
AS/NZS 1044:1992
Published Date: 08/17/1992
Limits and methods of measurement of radio interference characteristics of household electrical appliances, portable tools and similar electrical apparatus
33.26 €