NR NR/L3/OPS/045/3.10 ISSUE 1 PDF

NR NR/L3/OPS/045/3.10 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.10 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-3-10-issue-1_2764008

Choose Document Language:
5.70 €
Need Help?
PDF ONLY

This procedure applies to Route Operations Control when dealing with incidents involving the third rail system and maintains the safety of the operational railway.

PURPOSE

This procedure allows Network Rail’s Route Operations Control to safely deal with incidents affecting the third rail DC lines system.


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 2
Published : 09/02/2017

History


Related products

NR NR/SIN/207 ISSUE 2
Published Date: 04/18/2024
Duvine DD920 Battery Chargers
7.50 €
NR NR/L3/INI/PG115/PS/010 ISSUE 1
Published Date: 06/05/2010
Planning and Programme Controls: Profiling of OLE Wiremen Demand
13.20 €
NR NR/L3/SIG/11761/D040 ISSUE 2
Published Date: 09/21/2015
ETX00 Check Rail Design Note with Application Rules for Tuned Zone Lengths
13.20 €
NR TWI 2S009 ISSUE 1
Published Date: 03/01/2005
How to Replace Baseplates in S&C
5.70 €

Best-Selling Products

Application-Specific Integrated Circuits
Published Date: 06/10/1997
21.00 €
C++ FAQs
Published Date: 12/11/1998
13.50 €