NR NR/L3/ELP/27240/NR/DIST C22I ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C22I ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C22I ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Routine Maintenance of Weatherproof Metal Enclosed Lucy SF6 12kV 20kA, 630A/250A Sabre VRN2a Ring Main Unit

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C22I

Includes: This instruction covers the routine maintenance of a weatherproof metal enclosed Lucy SF6, 12kV, 20kA, 630A/250A Sabre VRN2a ring main unit.


Edition : 1
File Size : 1 file , 270 KB
Number of Pages : 5
Published : 06/03/2023

History


Related products

NR NR/L2/SIG/10027 ISSUE 6
Published Date: 06/01/2024
Surveillance of Signal Maintenance Activities
$13.2
NR TI 010 ISSUE 1
Published Date: 03/01/2005
SSI MPM and PPM Fault Labels
$5.7
NR TWI 3P048 ISSUE 1
Published Date: 03/01/2005
How to Plan the Removal of Longitudinal Timbers
$5.7
NR NB 000 ISSUE 48
Published Date: 06/01/2023
Current Index of Notice Boards Contained in NR/L2/SIG/11120
$7.5

Best-Selling Products

HIR FTV RP 2007
Published Date: 03/01/2018
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels
$69
HIR FTV RP 2007
Published Date: 01/03/2023
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels, Recommended Practice 2007(c)
$79.5
HIR Publication 2023
Published Date: 12/31/2023
A publication providing insights into the methods used to repair small, existing, shop-fabricated steel Above-ground, Atmospheric Pressure, Vented, Tanks designed and used for Petroleum and Non- Petroleum storage
$47.7