NR NR/L3/SCO/311/16 ISSUE 3 PDF

NR NR/L3/SCO/311/16 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/16 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Management of Safety Related Components

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sco-311-16-issue-3_2771685

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details requirements for the handling, storage and transportation of safety related components at and between maintenance and storage locations, to prevent damage and degradation.

Specific instruction is provided within this module for stored and delivered wheelsets to manage the risks of damage and defects arising during storage, handling and shipping prior to fitment in accordance with GM/RT2466 and RIS-2704-RST.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure


Edition : 3
File Size : 1 file , 350 KB
Number of Pages : 22
Published : 03/05/2022

History

NR NR/L3/SCO/311/16 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Management of Safety Related Components
18.60 €
NR NR/L3/SCO/311/16 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handling and Storage of Safety Related Components
13.20 €

Related products

NR RT/D/S/012 ISSUE 5
Published Date: 04/01/2000
Content of Railtracks Infrastructure Maintenance Contractor's Stewardship Report
13.20 €
NR T60270 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Fringe - Input from Fringe Box. Acc: Relay Interface Peripheral Location Circuit
5.70 €
NR SSI8003-85 ISSUE 4
Published Date: 09/03/2022
Robust Train Protection
18.60 €
NR BRS-SM 2040
Published Date: 08/12/1991
Colour Light Signals Sliding Latch for Footstep
5.70 €

Best-Selling Products

ANS 1-1967
Published Date: 08/18/1967
A Code of Good Practices for the Performance of Critical Experiments
5.70 €
ANS 1-1972
Published Date: 08/19/1971
Safety Guide for the Performance of Critical Experiments
15.00 €
ANS 1-1975 (R1981)
Published Date: 04/29/1975
Safety Guide for the Performance of Critical Experiments
15.00 €
ANS 1-1987(R1992)
Published Date: 06/24/1987
Safety Guide for the Performance of Critical Experiments
16.50 €
ANS 1-2000 (R2024)
Published Date: 03/23/2000
Conduct of Critical Experiments
16.50 €
ANS 10.2-1971 (ANS.STD. 3)
Published Date: 04/01/1971
Recommended Programming Practices to Facilitate the Interchange of Digital Computer Programs
11.70 €