Name:
NR NR/L3/ELP/27240/NR/DIST C26M ISSUE 1 PDF
Published Date:
12/05/2020
Status:
[ Active ]
Publisher:
Network Rail
Includes: This instruction describes how to test D.C. frame leakage protection installed on Secheron UR36 and UR40 switchboards. It follows the
existing work instruction methodology that tests stage 1 and stage 2 separately however a single test may be undertaken if agreement is
reached with the ECR.
Excludes: All other types of frame leakage protection
| Edition : | 1 |
| File Size : | 1 file , 190 KB |
| Number of Pages : | 5 |
| Published : | 12/05/2020 |