NR NR/L3/ELP/27240/NR/DIST C26M ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C26M ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C26M ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Routine Testing of D.C. Frame Leakage Protection - Secheron UR36/UR40

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-27240-nr-dist-c26m-issue-1_2764719

Choose Document Language:
5.70 €
Need Help?
NR/L3/ELP/27240/NR/DIST C26M

Includes: This instruction describes how to test D.C. frame leakage protection installed on Secheron UR36 and UR40 switchboards. It follows the

existing work instruction methodology that tests stage 1 and stage 2 separately however a single test may be undertaken if agreement is

reached with the ECR.

Excludes: All other types of frame leakage protection


Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 5
Published : 12/05/2020

History


Related products

NR NR/L2/TRK/6100/MOD03 ISSUE 6
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: Installing Stretcher Bars and Setting them to the Correct Length
18.60 €
NR E10085/20 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region "Post Office 3000 Type" Relay Sets Type D
5.70 €
NR SSIDIS192 ISSUE 3
Published Date: 09/01/2018
Alstom Modular Signalling Relay-Interfaced Signals
18.60 €
NR BR 807
Published Date: 05/01/1981
Automatic Revenue Collection - Car Park Control Equipment Type B
18.60 €

Best-Selling Products