NR NR/L3/ELP/27240/NR/DIST C34H ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C34H ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C34H ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Routine Maintenance of DC Voltage Monitoring Panels Installed at Ludgate Cellars Subst

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
NR/L3/ELP/27240/NR/DIST C34H

Includes: This instruction covers the procedure for the routine maintenance of D.C. Voltage Monitoring (VM) panels installed at Ludgate Cellars substation (see figure 1).

Excludes: These instructions do not include the routine maintenance of main D.C. contactor suites at Ludgate Cellars Substation or the Trackside Slave Contactors (TSC) equipment.


Edition : 1
File Size : 1 file , 280 KB
Number of Pages : 9
Published : 12/05/2020

History


Related products

NR NR/L3/OPS/250 ISSUE 1
Published Date: 06/05/2021
National Emergency Plan Index
$18.6
NR NR/L2/SIG/11201 ISSUE 20
Published Date: 09/07/2024
Signalling Design Handbook
$13.2
NR NR/L3/OPS/021/02 ISSUE 1
Published Date: 09/05/2020
Weather Management Index: Summer Management
$18.6
NR BRS-SC 8
Published Date: 02/09/1970
Mechanical Signal Connections - Cranks, Wheels & Pulleys - Signal Wheel Leg Concrete
$5.7

Best-Selling Products