NR NR/L3/ELP/27406/MOD K ISSUE 1 PDF

NR NR/L3/ELP/27406/MOD K ISSUE 1 PDF

Name:
NR NR/L3/ELP/27406/MOD K ISSUE 1 PDF

Published Date:
12/03/2011

Status:
[ Active ]

Description:

Engineering Deliverable Requirements for Electrical Power Asset Design: Protection (DC & 3 phase)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY


Edition : 1
File Size : 1 file , 46 KB
Number of Pages : 3
Published : 12/03/2011

History


Related products

NR TEF 3289 ISSUE 3
Published Date: 12/04/2021
Critical Rail Temperature Assessment Form 3A for CWR Tamping, Mechanical and Manual Correction
$5.7
NR NR/CIV/SD/FORMB/390 ISSUE P2
Published Date: 08/01/2006
Form B: Earthworks Instrumentation
$7.5
NR BRS-SM 2244
Published Date: 10/19/1987
Rail Clamp Point Lock Mk 2 - Point Layout with Hydraulic Actuators Tandem Turnout in 113Fb vertical Rail for Cast Body S/A. Cyl.
$5.7
NR NR/SIN/209 ISSUE 1
Published Date: 06/13/2022
Regulatory Requirements for PCB Contaminated Equipment
$18.6

Best-Selling Products

IFI 100/107
Published Date: 04/01/2002
PREVAILING TORQUE-TYPE STEEL HEX AND HEX FLANGE NUTS REGULAR AND LIGHT HEX SERIES
$4.5
IFI 101 (R2013)
Published Date: 07/01/2002
TORQUE-TENSION REQUIREMENTS FOR PREVAILING-TORQUE TYPE STEEL HEX AND HEX FLANGE NUTS
$12
IFI 108
Published Date: 01/06/2008
GRADE AND SOURCE IDENTIFICATION MARKING OF GRADES B AND C PREVAILING-TORQUE TYPE HEX LOCKNUTS
$12
IFI 110 (R2013)
Published Date: 02/07/2003
GLOSSARY OF TERMS RELATING TO BLIND RIVETS
$12