NR NR/L3/ELP/29987/MOD X ISSUE 2 PDF

NR NR/L3/ELP/29987/MOD X ISSUE 2 PDF

Name:
NR NR/L3/ELP/29987/MOD X ISSUE 2 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This module is applicable only to areas that are required to adopt a process for securing points of disconnection to form points of isolation (a SIP process) and all future sections of electrification of Network Rail infrastructure.

The requirements of this module are applicable to Network Rail personnel and to Network Rail’s contractors.

This module does not include requirement for the following:

• Where the isolation, testing and earthing of overhead line equipment are to be implemented in areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure.

• Work on or about Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system

Purpose

This module defines the requirements for securing points of disconnection, creating points of isolation, when implementing an Earthed Isolation.

This module combines relevant local Supplementary Isolation Processes (SIP) that have been implemented into one process and provides a consistent securing process for all future applications.

The requirements include the specific rules and procedures to be followed so that a sufficient documented safe system of work is prepared and implemented that complies with the Electricity at Work Regulations 1989, specifically Regulation 12.

 


Edition : 2
File Size : 1 file , 3.3 MB
Number of Pages : 58
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD X ISSUE 5
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 4
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 3
Published Date: 09/04/2021
Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/ELP/29987/MOD X ISSUE 2
Published Date: 12/01/2018
Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$24.3

Related products

NR NR/L3/ELP/27052/05 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line Within the Tunnel
$5.7
NR NR/L2/TRK/001/MOD11 ISSUE 11
Published Date: 03/05/2022
Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
$18.6
NR BRS-SM 7 ISSUE B
Published Date: 12/02/1974
Signal Arms Main
$5.7
NR NR/L2/CIV/295 ISSUE 2
Published Date: 09/01/2018
Scour Assessment of Bridges, Culverts and Retaining Walls
$24.3

Best-Selling Products

JSSG JSSG-2000B Notice 1 - Validation
Published Date: 08/21/2009
Air System
$3.6
JSSG JSSG-2000B Notice 2 - Validation
Published Date: 08/06/2014
Air System
$3.6
JSSG JSSG-2001A
Published Date: 10/22/2002
Air Vehicle
$35.7
JSSG JSSG-2001B Notice 1 - Validation 1
Published Date: 01/29/2009
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 2 - Validation 2
Published Date: 12/03/2013
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 3 - Validation 3
Published Date: 09/12/2018
Air Vehicle
$3.6